Permit: TC-MDP-0424-00376
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
10354 E RED SLATE PL
Address NEW:
10354 E RED SLATE PL
Apply Date:
12/05/2024
Applicant:
Description:
SFR MER1301460 T21-M0072 REV1 roof covering change (Model master plan TC-MDP-0223-00403)
Permit Reviews
Permit Number - TC-MDP-0424-00376
Permit Status: Complete
Permit Description: SFR MER1301460 T21-M0072 REV1 roof covering change (Model master plan TC-MDP-0223-00403)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/29/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/31/2025 | REQUIRES RESUBMIT |
| 02/04/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 02/05/2025 | APPROVED |
| 12/23/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.2 | 12/31/2024 | APPROVED |
| 01/08/2025 | RESTAMP - RESIDENTIAL v.1 | 01/10/2025 | APPROVED |
| 06/10/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/10/2025 | REQUIRES RESUBMIT |
| 06/17/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 06/17/2025 | APPROVED |
| 12/09/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 12/19/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-MDP-0424-00376
Permit Status: Complete
Permit Description: SFR MER1301460 T21-M0072 REV1 roof covering change (Model master plan TC-MDP-0223-00403)
| Date | Description | Comments |
|---|---|---|
| 12/09/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 12/23/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 12/09/2024 | Post-Installed Anchor Inspection Report is required. | |
| 12/09/2024 | Post-Tension Inspection Report is required. | |
| 04/01/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 04/01/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0424-00376
Permite Description: SFR MER1301460 T21-M0072 REV1 roof covering change (Model master plan TC-MDP-0223-00403)
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/28/2025 | RSBU - Building Progress | N/A | Not Applicable | |
| 05/28/2025 | COT - RSEL - Outdoor Lighting | N/A | Partial Pass | Rough in |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0424-00376
Permit Description: SFR MER1301460 T21-M0072 REV1 roof covering change (Model master plan TC-MDP-0223-00403)
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/03/2025 | COT - RSPL - Rough Soil | Passed | Plumbing per plan, ok to backfill 4/3/25 | |
| 04/03/2025 | COT - RSPL - Sewer | Passed | Plumbing per plan, ok to backfill 4/3/25 | |
| 04/03/2025 | COT - RSPL - Yard Water Line | Passed | Plumbing per plan, ok to backfill 4/3/25 | |
| 04/11/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Passed 4/11/25 ok to pour concrete | |
| 04/11/2025 | COT - RSBU - Preslab | Passed | Passed 4/11/25 ok to pour concrete | |
| 04/11/2025 | COT - RSEL - Electrical Underground | Passed | Passed 4/11/25 ok to pour concrete | |
| 04/11/2025 | COT - RSEL - Grounding/Bonding | Passed | Partial Passed 4/11/25 will check connection at intermediate or electrical clearance | |
| 04/28/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 04/28/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 05/13/2025 | BULD - Electrical Clearance | Passed | Passed 5/13/25 CLEARANCE ECO | |
| 05/13/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Passed 5/13/25 | |
| 05/13/2025 | COT - RSPL - Gas Pressure Test | Passed | Passed 5/13/25 | |
| 05/27/2025 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 07/11/2025 | COT - BULD - SWG Clearance | Passed | Passed 7/11/25 CLEARANCE SWG | |
| 07/22/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 07/22/2025 | COT - RSEL - Electrical Final | Passed | ||
| 07/22/2025 | COT - RSME - Mechanical Final | Passed | ||
| 07/22/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 07/22/2025 | ENGR Engineering Final | Passed | ||
| 07/22/2025 | RSBU - Building Final | Passed |