Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0424-00376
Permit Details
Apply Date:
12/05/2024
Applicant:
Daria Hopkins
Description:
SFR MER1301460 T21-M0072 REV1 roof covering change (Model master plan TC-MDP-0223-00403)
Permit Reviews
Permit Number - TC-MDP-0424-00376
Permit Status: Needs resubmittal
Permit Description: SFR MER1301460 T21-M0072 REV1 roof covering change (Model master plan TC-MDP-0223-00403)
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
12/09/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 12/19/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-MDP-0424-00376
Permit Status: Needs resubmittal
Permit Description: SFR MER1301460 T21-M0072 REV1 roof covering change (Model master plan TC-MDP-0223-00403)
Total Outstanding Activity Conditions - 6
Date | Name |
---|---|
04/01/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
04/01/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
12/09/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
12/09/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
12/09/2024 | Post-Installed Anchor Inspection Report is required. |
12/09/2024 | Post-Tension Inspection Report is required. |