Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
4787 E JULIAN WASH DR
Apply Date:
04/04/2024
Applicant:
Dana Petty
Description:
SFR MERI132021 T21-M0062

Permit Reviews

Permit Number - TC-MDP-0424-00372
Permit Status: Complete
Permit Description: SFR MERI132021 T21-M0062
Start Date Submittal Complete Date Status  
01/31/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.3 02/04/2025 REQUIRES RESUBMIT Review Details
01/22/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 01/23/2025 REQUIRES RESUBMIT Review Details
02/04/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.4 02/05/2025 APPROVED Review Details
01/17/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/17/2025 REQUIRES RESUBMIT Review Details
10/10/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/10/2024 APPROVED Review Details
04/04/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.1 04/09/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0424-00372
Permit Status: Complete
Permit Description: SFR MERI132021 T21-M0062
Date Description Comments
04/05/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
04/05/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/17/2025 Post-Installed Anchor Inspection Report is required.
04/05/2024 Post-Tension Inspection Report is required.
04/01/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
04/01/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
04/05/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
04/05/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0424-00372
Permite Description: SFR MERI132021 T21-M0062
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
12/18/2024 BULD - Electrical Clearance N/A Partial Pass 12/18/24 TEP clearance: ECO partial pass

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0424-00372
Permit Description: SFR MERI132021 T21-M0062
Total Completed Inspections - 22
Date Description Inspector Results Comments
11/05/2024 COT - RSPL - Rough Soil Passed 11-5-24, underground plumbing verified as per approved plans. Okay to backfill with shading.
11/05/2024 COT - RSPL - Sewer Passed 11-5-24, sewer connection verified as per approved plans. Okay to backfill with shading.
11/05/2024 COT - RSPL - Yard Water Line Passed 11-5-24, main water line connection verified as per approved plans. Okay to backfill with shading.
11/05/2024 COT - RSPL - Backwater Valve Passed 11-5-24, backwater valve verified as per approved plans. Okay to backfill with shading.
11/13/2024 COT - RSBU - Excavation/Rebar/Zoning Passed 11-13-24, excavation/rebar/zoning verified as per approved plans. Okay to pour concrete.
11/13/2024 COT - RSBU - Preslab Passed 11-13-24, preslab verified as per approved plans. Okay to pour concrete.
11/13/2024 COT - RSEL - Electrical Underground Passed 11-13-24, electrical underground verified as per approved plans. Okay to pour concrete.
11/13/2024 COT - RSEL - Grounding/Bonding Passed 11-13-24, grounding /bonding as per approved plans. Okay to pour concrete.
11/26/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 11-26-24, clip/sheathing inspection approved. 0kay to continue with construction
11/26/2024 COT - RSBU - Roof Nailing Passed 11-26-24, roof nailing together with truss bracing verified as per approved plans. Okay to continue with construction.
12/18/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 12/18/24 passed
12/18/2024 COT - RSPL - Gas Pressure Test Passed 12/18/24 pass
12/31/2024 COT - RSBU - Interior Shear Bracing Passed Passed 12/31/24 ok to tape
02/12/2025 COT - BULD - SWG Clearance Passed 2/12/25 approval for SWG clearance
02/24/2025 BULD - Electrical Clearance Passed 24 FEB 25
TEP Clearance: ECO
02/24/2025 COT - RSEL - Electrical Final Passed
02/24/2025 COT - RSEL - Outdoor Lighting Passed
02/24/2025 COT - RSME - Mechanical Final Passed
02/24/2025 COT - RSPL - Plumbing Final Passed
02/24/2025 ENGR Engineering Final Passed CO Ready
02/24/2025 RSBU - Building Final Passed
02/24/2025 RSBU - Building Progress Passed