Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
4759 E JULIAN WASH DR
Apply Date:
06/05/2024
Applicant:
Dana Petty
Description:
SFR MERI132021 T21-M0062

Permit Reviews

Permit Number - TC-MDP-0424-00370
Permit Status: Complete
Permit Description: SFR MERI132021 T21-M0062
Start Date Submittal Complete Date Status  
10/10/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.2 10/10/2024 APPROVED Review Details
10/10/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/10/2024 REQUIRES RESUBMIT Review Details
02/10/2025 MODEL PERMIT TEMPLATE REVIEW RESIDENTIAL v.1 03/19/2025 APPROVED Review Details
02/10/2025 SITE FROM MODEL PERMIT - SUBDIVISION v.1 02/18/2025 APPROVED Review Details
06/06/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.1 06/11/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0424-00370
Permit Status: Complete
Permit Description: SFR MERI132021 T21-M0062
Date Description Comments
06/06/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
06/06/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/06/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/06/2024 Post-Tension Inspection Report is required.
04/01/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
04/01/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
06/06/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
06/06/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0424-00370
Permit Description: SFR MERI132021 T21-M0062
Total Completed Inspections - 22
Date Description Inspector Results Comments
12/03/2024 COT - RSPL - Yard Water Line Passed 12-3-24, main water line inspection verified as per approved plans. Okay to backfill with shading.
12/03/2024 COT - RSPL - Sewer Passed 12-3-24, underground plumbing, sewer connection, and main water line inspection verified as per approved plans. Okay to backfill with shading.
12/03/2024 COT - RSPL - Rough Soil Passed 12-3-24, underground plumbing, sewer connection, and main water line inspection verified as per approved plans. Okay to backfill with shading.
12/03/2024 COT - RSPL - Backwater Valve Passed 12-3-24, backwater valve, underground plumbing, sewer connection, and main water line inspection verified as per approved plans. Okay to backfill with shading.
12/10/2024 COT - RSBU - Preslab Passed Clips, rebar, and straps per plan, no tears found in rebar sheathing, Ufer present and properly placed. Ok to pour 12/10/24
12/10/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Clips, rebar, and straps per plan, no tears found in rebar sheathing, Ufer present and properly placed. Ok to pour 12/10/24
12/10/2024 COT - RSEL - Electrical Underground Passed Clips, rebar, and straps per plan, no tears found in rebar sheathing, Ufer present and properly placed. Ok to pour 12/10/24
12/10/2024 COT - RSEL - Grounding/Bonding Passed Clips, rebar, and straps per plan, no tears found in rebar sheathing, Ufer present and properly placed. Ok to pour 12/10/24
12/20/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 12/20/24 corrections were made.
12/20/2024 COT - RSBU - Roof Nailing Passed 12/20/24 corrections were made
01/17/2025 BULD - Electrical Clearance Passed Ready for temp power CLEARANCE ECO 1/17/25
01/17/2025 COT - RSPL - Gas Pressure Test Passed Held pressure 1/17/25
01/21/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 1-21-25, intermediates approved. Okay to continue with construction.
02/04/2025 COT - RSBU - Interior Shear Bracing Passed 2/4/25 pass
03/19/2025 COT - BULD - SWG Clearance Passed 18 March 25
SOUTHWEST GAS CLEARANCE: SWG
04/02/2025 COT - RSEL - Electrical Final Passed
04/03/2025 COT - RSEL - Outdoor Lighting Passed
04/02/2025 COT - RSME - Mechanical Final Passed
04/02/2025 COT - RSPL - Plumbing Final Passed
04/02/2025 ENGR Engineering Final Passed CO READY
04/02/2025 RSBU - Building Final Passed
04/02/2025 RSBU - Building Progress Passed