Permit: TC-MDP-0424-00370
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
4759 E JULIAN WASH DR
Address NEW:
4759 E JULIAN WASH DR
Apply Date:
06/05/2024
Applicant:
Dana Petty
Description:
SFR MERI132021 T21-M0062
Permit Reviews
Permit Number - TC-MDP-0424-00370
Permit Status: Complete
Permit Description: SFR MERI132021 T21-M0062
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/10/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 10/10/2024 | APPROVED |
| 10/10/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/10/2024 | REQUIRES RESUBMIT |
| 02/10/2025 | MODEL PERMIT TEMPLATE REVIEW RESIDENTIAL v.1 | 03/19/2025 | APPROVED |
| 02/10/2025 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 02/18/2025 | APPROVED |
| 06/06/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 06/11/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0424-00370
Permit Status: Complete
Permit Description: SFR MERI132021 T21-M0062
| Date | Description | Comments |
|---|---|---|
| 06/06/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 06/06/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 06/06/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 06/06/2024 | Post-Tension Inspection Report is required. | |
| 04/01/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 04/01/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 06/06/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 06/06/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0424-00370
Permit Description: SFR MERI132021 T21-M0062
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/03/2024 | COT - RSPL - Yard Water Line | Passed | 12-3-24, main water line inspection verified as per approved plans. Okay to backfill with shading. | |
| 12/03/2024 | COT - RSPL - Sewer | Passed | 12-3-24, underground plumbing, sewer connection, and main water line inspection verified as per approved plans. Okay to backfill with shading. | |
| 12/03/2024 | COT - RSPL - Rough Soil | Passed | 12-3-24, underground plumbing, sewer connection, and main water line inspection verified as per approved plans. Okay to backfill with shading. | |
| 12/03/2024 | COT - RSPL - Backwater Valve | Passed | 12-3-24, backwater valve, underground plumbing, sewer connection, and main water line inspection verified as per approved plans. Okay to backfill with shading. | |
| 12/10/2024 | COT - RSBU - Preslab | Passed | Clips, rebar, and straps per plan, no tears found in rebar sheathing, Ufer present and properly placed. Ok to pour 12/10/24 | |
| 12/10/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Clips, rebar, and straps per plan, no tears found in rebar sheathing, Ufer present and properly placed. Ok to pour 12/10/24 | |
| 12/10/2024 | COT - RSEL - Electrical Underground | Passed | Clips, rebar, and straps per plan, no tears found in rebar sheathing, Ufer present and properly placed. Ok to pour 12/10/24 | |
| 12/10/2024 | COT - RSEL - Grounding/Bonding | Passed | Clips, rebar, and straps per plan, no tears found in rebar sheathing, Ufer present and properly placed. Ok to pour 12/10/24 | |
| 12/20/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 12/20/24 corrections were made. | |
| 12/20/2024 | COT - RSBU - Roof Nailing | Passed | 12/20/24 corrections were made | |
| 01/17/2025 | BULD - Electrical Clearance | Passed | Ready for temp power CLEARANCE ECO 1/17/25 | |
| 01/17/2025 | COT - RSPL - Gas Pressure Test | Passed | Held pressure 1/17/25 | |
| 01/21/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 1-21-25, intermediates approved. Okay to continue with construction. | |
| 02/04/2025 | COT - RSBU - Interior Shear Bracing | Passed | 2/4/25 pass | |
| 03/19/2025 | COT - BULD - SWG Clearance | Passed | 18 March 25 SOUTHWEST GAS CLEARANCE: SWG |
|
| 04/02/2025 | COT - RSEL - Electrical Final | Passed | ||
| 04/03/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 04/02/2025 | COT - RSME - Mechanical Final | Passed | ||
| 04/02/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 04/02/2025 | ENGR Engineering Final | Passed | CO READY | |
| 04/02/2025 | RSBU - Building Final | Passed | ||
| 04/02/2025 | RSBU - Building Progress | Passed |