Permit: TC-MDP-0424-00369
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
4738 E JULIAN WASH DR
Address NEW:
4738 E JULIAN WASH DR
Apply Date:
10/08/2024
Applicant:
Dana Petty
Description:
SFR MERI132021 T21-M0062
Permit Reviews
Permit Number - TC-MDP-0424-00369
Permit Status: Complete
Permit Description: SFR MERI132021 T21-M0062
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/10/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 10/11/2024 | APPROVED |
| 03/13/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/17/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0424-00369
Permit Status: Complete
Permit Description: SFR MERI132021 T21-M0062
| Date | Description | Comments |
|---|---|---|
| 10/10/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 10/11/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 10/11/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 10/11/2024 | Post-Tension Inspection Report is required. | |
| 04/01/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 04/01/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 10/11/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 10/11/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0424-00369
Permite Description: SFR MERI132021 T21-M0062
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/27/2024 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Canceled | Canceled by Justin |
| 12/27/2024 | COT - RSBU - Preslab | N/A | Canceled | Canceled by Justin |
| 12/27/2024 | COT - RSEL - Electrical Underground | N/A | Canceled | Canceled by Justin |
| 12/27/2024 | COT - RSEL - Grounding/Bonding | N/A | Canceled | Canceled by Justin |
| 01/14/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Re-inspection required | Anchor bolts at shear wall and marked areas throughout |
| 01/14/2025 | COT - RSBU - Roof Nailing | N/A | Re-inspection required | Anchor bolts at shear wall and marked areas throughout |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0424-00369
Permit Description: SFR MERI132021 T21-M0062
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/18/2024 | COT - RSPL - Yard Water Line | Passed | 12/18/24 PASS OK to backfill, SHADING required. | |
| 12/18/2024 | COT - RSPL - Sewer | Passed | 12/18/24 PASS OK to backfill, SHADING required. | |
| 12/18/2024 | COT - RSPL - Rough Soil | Passed | 12/18/24 PASS OK to backfill, SHADING required. | |
| 12/18/2024 | COT - RSPL - Backwater Valve | Passed | 12/18/24 PASS OK to backfill, SHADING required. | |
| 01/03/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Rebar and hold downs per schedule, ok to pour concrete 1/3/25 | |
| 01/03/2025 | COT - RSBU - Preslab | Passed | Rebar and hold downs per schedule, ok to pour concrete 1/3/25 | |
| 01/03/2025 | COT - RSEL - Electrical Underground | Passed | Rebar and hold downs per schedule, ok to pour concrete 1/3/25 | |
| 01/03/2025 | COT - RSEL - Grounding/Bonding | Passed | Rebar and hold downs per schedule, ok to pour concrete 1/3/25 | |
| 01/15/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 1/15/25 corrections made | |
| 01/15/2025 | COT - RSBU - Roof Nailing | Passed | 1/15/25 corrections made | |
| 02/07/2025 | BULD - Electrical Clearance | Passed | Passed ok for temp power 2/7/25 CLEARANCE ECO | |
| 02/07/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Held pressure 2/7/25 | |
| 02/07/2025 | COT - RSPL - Gas Pressure Test | Passed | Held pressure 2/7/25 | |
| 02/14/2025 | COT - RSBU - Interior Shear Bracing | Passed | Passed interior shear 2/14/25 ok to tape | |
| 04/02/2025 | COT - BULD - SWG Clearance | Passed | 2 April 25 SOUTHWEST GAS CLEARANCE: SWG |
|
| 04/15/2025 | COT - RSEL - Electrical Final | Passed | 4/15/25 passed final | |
| 04/15/2025 | COT - RSEL - Outdoor Lighting | Passed | 4/15/25 passed final | |
| 04/15/2025 | COT - RSME - Mechanical Final | Passed | 4/15/25 passed final | |
| 04/15/2025 | COT - RSPL - Plumbing Final | Passed | 4/15/25 passed final | |
| 04/15/2025 | ENGR Engineering Final | Passed | ||
| 04/15/2025 | RSBU - Building Final | Passed | 4/15/25 passed final | |
| 04/15/2025 | RSBU - Building Progress | Passed | 4/15/25 passed final |