Permit: TC-MDP-0424-00368
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
4771 E JULIAN WASH DR
Address NEW:
4771 E JULIAN WASH DR
Apply Date:
04/30/2024
Applicant:
Dana Petty
Description:
SFR MERI132021 T21-M0062
Permit Reviews
Permit Number - TC-MDP-0424-00368
Permit Status: Complete
Permit Description: SFR MERI132021 T21-M0062
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/30/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 05/07/2024 | APPROVED |
| 10/09/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/09/2024 | APPROVED |
| 01/22/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 01/23/2025 | REQUIRES RESUBMIT |
| 01/17/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/17/2025 | REQUIRES RESUBMIT |
| 02/04/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.4 | 02/05/2025 | APPROVED |
| 01/31/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.3 | 02/04/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-MDP-0424-00368
Permit Status: Complete
Permit Description: SFR MERI132021 T21-M0062
| Date | Description | Comments |
|---|---|---|
| 05/01/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 05/01/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 01/17/2025 | Post-Installed Anchor Inspection Report is required. | |
| 05/01/2024 | Post-Tension Inspection Report is required. | |
| 04/01/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 04/01/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 05/01/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 05/01/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0424-00368
Permit Description: SFR MERI132021 T21-M0062
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/18/2024 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading required. 11/18/2024 | |
| 11/18/2024 | COT - RSPL - Sewer | Passed | Okay to backfill. Shading required. 11/18/2024 | |
| 11/18/2024 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading required. 11/18/2024 | |
| 11/22/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 11-22-24, preslab, setbacks, and grounding/bonding per approved plans. Okay to pour concrete. | |
| 11/22/2024 | COT - RSBU - Preslab | Passed | 11-22-24, preslab per approved plans. Okay to pour concrete. | |
| 11/22/2024 | COT - RSEL - Electrical Underground | Passed | 11-22-24, underground electric,grounding/bonding approved. | |
| 11/22/2024 | COT - RSEL - Grounding/Bonding | Passed | 11-22-24, preslab and grounding/bonding per approved plans. Okay to pour concrete. | |
| 12/11/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 12/10/24 corrections made | |
| 12/11/2024 | COT - RSBU - Roof Nailing | Passed | 12/10/24 corrections made | |
| 01/08/2025 | BULD - Electrical Clearance | Passed | Ready for temp power CLEARANCE ECO 1/8/25 | |
| 01/08/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Passed intermediate 1/8/25 | |
| 01/08/2025 | COT - RSPL - Gas Pressure Test | Passed | Holds pressure 1/8/25 | |
| 01/22/2025 | COT - RSBU - Interior Shear Bracing | Passed | 1/22/25 pass | |
| 03/07/2025 | COT - BULD - SWG Clearance | Passed | 07 Mar 25 Southwest gas clearance: SWG |
|
| 03/19/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 03/19/2025 | COT - RSME - Mechanical Final | Passed | ||
| 03/19/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 03/19/2025 | ENGR Engineering Final | Passed | CO Ready | |
| 03/19/2025 | RSBU - Building Progress | Passed | ||
| 03/20/2025 | COT - RSEL - Electrical Final | Passed | 3-20-25, electrical final approved. | |
| 03/20/2025 | RSBU - Building Final | Passed | 3-20-25, building final approved. |