Permit: TC-MDP-0424-00367
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
4775 E JULIAN WASH DR
Address NEW:
4775 E JULIAN WASH DR
Apply Date:
05/10/2024
Applicant:
Dana Petty
Description:
SFR MERI132021 T21-M0062
Permit Reviews
Permit Number - TC-MDP-0424-00367
Permit Status: Complete
Permit Description: SFR MERI132021 T21-M0062
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/21/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/25/2025 | REQUIRES RESUBMIT |
| 01/31/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.3 | 01/31/2025 | APPROVED |
| 01/22/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 01/22/2025 | REQUIRES RESUBMIT |
| 10/09/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/09/2024 | APPROVED |
| 05/13/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 05/17/2024 | APPROVED |
| 03/26/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 03/28/2025 | APPROVED |
| 01/17/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/17/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-MDP-0424-00367
Permit Status: Complete
Permit Description: SFR MERI132021 T21-M0062
| Date | Description | Comments |
|---|---|---|
| 05/13/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 05/13/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 01/17/2025 | Post-Installed Anchor Inspection Report is required. | |
| 05/13/2024 | Post-Tension Inspection Report is required. | |
| 04/01/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 04/01/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 05/13/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 05/13/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0424-00367
Permit Description: SFR MERI132021 T21-M0062
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/18/2024 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading required. 11/18/2024 | |
| 11/18/2024 | COT - RSPL - Sewer | Passed | Okay to backfill. Shading required. 11/18/2024 | |
| 11/18/2024 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading required. 11/18/2024 | |
| 11/22/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 11-22-24, preslab, setbacks, and grounding/bonding per approved plans. Okay to pour concrete. | |
| 11/22/2024 | COT - RSBU - Preslab | Passed | 11-22-24, preslab per approved plans. Okay to pour concrete. | |
| 11/22/2024 | COT - RSEL - Electrical Underground | Passed | 11-22-24, preslab and grounding/bonding per approved plans. Okay to pour concrete. | |
| 11/22/2024 | COT - RSEL - Grounding/Bonding | Passed | 11-22-24, grounding/bonding approved. | |
| 12/06/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 12-6-24, exterior clip/sheathing approved. Okay to continue with construction. | |
| 12/06/2024 | COT - RSBU - Roof Nailing | Passed | 12-6-24, exterior clip/sheathing and nailing approved. Okay to continue with construction. | |
| 12/27/2024 | BULD - Electrical Clearance | Passed | Ready for temp power CLEARANCE ECO | |
| 12/27/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Passed 12/27/24 | |
| 12/27/2024 | COT - RSPL - Gas Pressure Test | Passed | Hold pressure 12/27/24 | |
| 01/10/2025 | COT - RSBU - Interior Shear Bracing | Passed | Passed interior shear wall 1/10/25 ok to tape | |
| 02/25/2025 | COT - BULD - SWG Clearance | Passed | 2/25/25: SWG CLEARANCE APPROVED OK FOR METER TAG | |
| 03/07/2025 | COT - RSEL - Electrical Final | Passed | ||
| 03/07/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 03/07/2025 | COT - RSME - Mechanical Final | Passed | ||
| 03/07/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 03/07/2025 | ENGR Engineering Final | Passed | ||
| 03/07/2025 | RSBU - Building Final | Passed | ||
| 03/07/2025 | RSBU - Building Progress | Passed |