Permit: TC-MDP-0423-00939
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
12828 E TORTOISE POINTE DR
Address NEW:
12828 E TORTOISE POINTE DR
Apply Date:
08/17/2023
Applicant:
Amy Stokes, Operations Accountant
Description:
SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Permit Reviews
Permit Number - TC-MDP-0423-00939
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/25/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/25/2023 | APPROVED |
| 08/17/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 08/21/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0423-00939
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 08/17/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 08/17/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 08/17/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 08/17/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
| 08/18/2023 | Post-Tension Inspection Report is required. |
| 08/18/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-0423-00939
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
| Date | Description | Comments |
|---|---|---|
| 08/17/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0423-00939
Permite Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/21/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Not Ready | 12/21/23. not ready. Nail headers or use RSP clips |
| 12/21/2023 | COT - RSPL - Gas Pressure Test | N/A | Not Ready | 12/21/23. not ready. Nail headers or use RSP clips |
| 04/12/2024 | COT - RSME - Mechanical Final | N/A | Re-inspection required | 4/12/24: bathroom 3 missing receptacle at double vanity. Wrong size breaker for A/C unit #2 should be a max 50amp breaker currently has a 60. Label the A/C units 1&2 at the location of the units. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0423-00939
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/06/2023 | COT - RSPL - Yard Water Line | Passed | ||
| 10/06/2023 | COT - RSPL - Sewer | Passed | ||
| 10/06/2023 | COT - RSPL - Rough Soil | Passed | ||
| 10/06/2023 | COT - RSPL - Backwater Valve | Passed | ||
| 10/13/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 10/13/2023 | COT - RSBU - Preslab | Passed | ||
| 10/13/2023 | COT - RSEL - Electrical Underground | Passed | ||
| 10/13/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
| 11/01/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 11/01/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 01/08/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 1-8-24: Headers have been properly nailed. Mechanical, electrical, and plumbing rough-in are complete. Okay to proceed with insulation and drywall installation. | |
| 01/08/2024 | BULD - Electrical Clearance | Passed | ECO TEP Clearance issued. | |
| 01/08/2024 | COT - RSPL - Gas Pressure Test | Passed | 1-8-24: Gas line is holding 15# of compressed air. Okay to proceed. | |
| 01/17/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 01/22/2024 | COT - BULD - SWG Clearance | Passed | SWG for meter only | |
| 04/09/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
| 04/09/2024 | RSBU - Building Progress | Passed | ||
| 04/09/2024 | ENGR Engineering Final | Passed | ||
| 04/12/2024 | COT - RSPL - Plumbing Final | Passed | ||
| 04/15/2024 | COT - RSEL - Electrical Final | Passed | 4/15/24: receptacles has been installed in bathroom, breakers has been replaced with a 50 amp breaker, and A/C units have been labeled. Okay to issue Certificate of Occupancy. | |
| 04/15/2024 | RSBU - Building Final | Passed | 4/15/24: receptacles has been installed in bathroom, breakers has been replaced with a 50 amp breaker, and A/C units have been labeled. okay to issue Certificate of Occupancy. | |
| 04/15/2024 | COT - RSME - Mechanical Final | Passed |