Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
08/17/2023
Applicant:
Amy Stokes, Operations Accountant
Description:
SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes

Permit Reviews

Permit Number - TC-MDP-0423-00939
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Start Date Submittal Complete Date Status  
08/25/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/25/2023 APPROVED Review Details
08/17/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 08/21/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0423-00939
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Total Outstanding Activity Conditions - 6
Date Name
08/17/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
08/17/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
08/17/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
08/17/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
08/18/2023 Post-Tension Inspection Report is required.
08/18/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0423-00939
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Date Description Comments
08/17/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0423-00939
Permite Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
12/21/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Not Ready 12/21/23. not ready. Nail headers or use RSP clips
12/21/2023 COT - RSPL - Gas Pressure Test N/A Not Ready 12/21/23. not ready. Nail headers or use RSP clips
04/12/2024 COT - RSME - Mechanical Final N/A Re-inspection required 4/12/24: bathroom 3 missing receptacle at double vanity. Wrong size breaker for A/C unit #2 should be a max 50amp breaker currently has a 60. Label the A/C units 1&2 at the location of the units.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0423-00939
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Total Completed Inspections - 22
Date Description Inspector Results Comments
10/06/2023 COT - RSPL - Yard Water Line Passed
10/06/2023 COT - RSPL - Sewer Passed
10/06/2023 COT - RSPL - Rough Soil Passed
10/06/2023 COT - RSPL - Backwater Valve Passed
10/13/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
10/13/2023 COT - RSBU - Preslab Passed
10/13/2023 COT - RSEL - Electrical Underground Passed
10/13/2023 COT - RSEL - Grounding/Bonding Passed
11/01/2023 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
11/01/2023 COT - RSBU - Roof Nailing Passed
01/08/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 1-8-24: Headers have been properly nailed. Mechanical, electrical, and plumbing rough-in are complete. Okay to proceed with insulation and drywall installation.
01/08/2024 BULD - Electrical Clearance Passed ECO TEP Clearance issued.
01/08/2024 COT - RSPL - Gas Pressure Test Passed 1-8-24: Gas line is holding 15# of compressed air. Okay to proceed.
01/17/2024 COT - RSBU - Interior Shear Bracing Passed
01/22/2024 COT - BULD - SWG Clearance Passed SWG for meter only
04/09/2024 COT - RSEL - Outdoor Lighting Passed
04/09/2024 RSBU - Building Progress Passed
04/09/2024 ENGR Engineering Final Passed
04/12/2024 COT - RSPL - Plumbing Final Passed
04/15/2024 COT - RSEL - Electrical Final Passed 4/15/24: receptacles has been installed in bathroom, breakers has been replaced with a 50 amp breaker, and A/C units have been labeled. Okay to issue Certificate of Occupancy.
04/15/2024 RSBU - Building Final Passed 4/15/24: receptacles has been installed in bathroom, breakers has been replaced with a 50 amp breaker, and A/C units have been labeled. okay to issue Certificate of Occupancy.
04/15/2024 COT - RSME - Mechanical Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2023-08-17_V1.PDF DOCUMENTS VIEW