Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
07/25/2023
Applicant:
Amy Stokes, Operations Accountant
Description:
SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes

Permit Reviews

Permit Number - TC-MDP-0423-00937
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Start Date Submittal Complete Date Status  
07/26/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 07/27/2023 APPROVED Review Details
03/08/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/12/2024 REQUIRES RESUBMIT Review Details
03/13/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.2 03/18/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0423-00937
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Date Description Comments
07/26/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
07/26/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
07/26/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
07/26/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
03/11/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
07/26/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0423-00937
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Total Completed Inspections - 21
Date Description Inspector Results Comments
08/30/2023 COT - RSPL - Rough Soil Passed
08/30/2023 COT - RSPL - Sewer Passed
08/30/2023 COT - RSPL - Yard Water Line Passed
09/07/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
09/07/2023 COT - RSBU - Preslab Passed
09/07/2023 COT - RSEL - Electrical Underground Passed
09/07/2023 COT - RSEL - Grounding/Bonding Passed
11/07/2023 BULD - Electrical Clearance Passed 11/7/23: TEP ECO
11/07/2023 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
11/07/2023 COT - RSBU - Roof Nailing Passed
11/22/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
11/22/2023 COT - RSPL - Gas Pressure Test Passed
12/12/2023 COT - RSBU - Interior Shear Bracing Passed
02/28/2024 COT - BULD - SWG Clearance Passed SWG for meter only
03/22/2024 COT - RSEL - Electrical Final Passed 3/22/24: Construction, mechanical, plumbing, and electrical is complete. All mechanical, electrical, and plumbing fixtures are installed and operational. AFCI and GFCI breakers are installed in electrical panel for bedrooms, bathrooms, kitchen, outdoor receptacles, and garage receptacles. Okay to issue C of O once Engineering inspection passes.
03/22/2024 COT - RSEL - Outdoor Lighting Passed Outdoor lighting is per plans and operational.
03/22/2024 COT - RSME - Mechanical Final Passed 3/22/24: Construction, mechanical, plumbing, and electrical is complete. All mechanical, electrical, and plumbing fixtures are installed and operational. AFCI and GFCI breakers are installed in electrical panel for bedrooms, bathrooms, kitchen, outdoor receptacles, and garage receptacles. Okay to issue C of O once Engineering inspection passes.
03/22/2024 COT - RSPL - Plumbing Final Passed 3/22/24: Construction, mechanical, plumbing, and electrical is complete. All mechanical, electrical, and plumbing fixtures are installed and operational. AFCI and GFCI breakers are installed in electrical panel for bedrooms, bathrooms, kitchen, outdoor receptacles, and garage receptacles. Okay to issue C of O once Engineering inspection passes.
03/22/2024 RSBU - Building Final Passed 3/22/24: Construction, mechanical, plumbing, and electrical is complete. All mechanical, electrical, and plumbing fixtures are installed and operational. AFCI and GFCI breakers are installed in electrical panel for bedrooms, bathrooms, kitchen, outdoor receptacles, and garage receptacles. Okay to issue C of O once Engineering inspection passes.
03/22/2024 RSBU - Building Progress Passed 3/22/24: Construction, mechanical, plumbing, and electrical is complete. All mechanical, electrical, and plumbing fixtures are installed and operational. AFCI and GFCI breakers are installed in electrical panel for bedrooms, bathrooms, kitchen, outdoor receptacles, and garage receptacles. Okay to issue C of O once Engineering inspection passes.
03/22/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2023-07-25_V1.PDF DOCUMENTS VIEW