Permit: TC-MDP-0423-00937
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
12758 E TORTOISE CANYON LN
Address NEW:
12758 E TORTOISE CANYON LN
Apply Date:
07/25/2023
Applicant:
Amy Stokes, Operations Accountant
Description:
SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Permit Reviews
Permit Number - TC-MDP-0423-00937
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/26/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 07/27/2023 | APPROVED |
| 03/08/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/12/2024 | REQUIRES RESUBMIT |
| 03/13/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 03/18/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0423-00937
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
| Date | Description | Comments |
|---|---|---|
| 07/26/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 07/26/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 07/26/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 07/26/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 03/11/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 07/26/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0423-00937
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/30/2023 | COT - RSPL - Rough Soil | Passed | ||
| 08/30/2023 | COT - RSPL - Sewer | Passed | ||
| 08/30/2023 | COT - RSPL - Yard Water Line | Passed | ||
| 09/07/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 09/07/2023 | COT - RSBU - Preslab | Passed | ||
| 09/07/2023 | COT - RSEL - Electrical Underground | Passed | ||
| 09/07/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
| 11/07/2023 | BULD - Electrical Clearance | Passed | 11/7/23: TEP ECO | |
| 11/07/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 11/07/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 11/22/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 11/22/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
| 12/12/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 02/28/2024 | COT - BULD - SWG Clearance | Passed | SWG for meter only | |
| 03/22/2024 | COT - RSEL - Electrical Final | Passed | 3/22/24: Construction, mechanical, plumbing, and electrical is complete. All mechanical, electrical, and plumbing fixtures are installed and operational. AFCI and GFCI breakers are installed in electrical panel for bedrooms, bathrooms, kitchen, outdoor receptacles, and garage receptacles. Okay to issue C of O once Engineering inspection passes. | |
| 03/22/2024 | COT - RSEL - Outdoor Lighting | Passed | Outdoor lighting is per plans and operational. | |
| 03/22/2024 | COT - RSME - Mechanical Final | Passed | 3/22/24: Construction, mechanical, plumbing, and electrical is complete. All mechanical, electrical, and plumbing fixtures are installed and operational. AFCI and GFCI breakers are installed in electrical panel for bedrooms, bathrooms, kitchen, outdoor receptacles, and garage receptacles. Okay to issue C of O once Engineering inspection passes. | |
| 03/22/2024 | COT - RSPL - Plumbing Final | Passed | 3/22/24: Construction, mechanical, plumbing, and electrical is complete. All mechanical, electrical, and plumbing fixtures are installed and operational. AFCI and GFCI breakers are installed in electrical panel for bedrooms, bathrooms, kitchen, outdoor receptacles, and garage receptacles. Okay to issue C of O once Engineering inspection passes. | |
| 03/22/2024 | RSBU - Building Final | Passed | 3/22/24: Construction, mechanical, plumbing, and electrical is complete. All mechanical, electrical, and plumbing fixtures are installed and operational. AFCI and GFCI breakers are installed in electrical panel for bedrooms, bathrooms, kitchen, outdoor receptacles, and garage receptacles. Okay to issue C of O once Engineering inspection passes. | |
| 03/22/2024 | RSBU - Building Progress | Passed | 3/22/24: Construction, mechanical, plumbing, and electrical is complete. All mechanical, electrical, and plumbing fixtures are installed and operational. AFCI and GFCI breakers are installed in electrical panel for bedrooms, bathrooms, kitchen, outdoor receptacles, and garage receptacles. Okay to issue C of O once Engineering inspection passes. | |
| 03/22/2024 | ENGR Engineering Final | Passed |