Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
04/27/2023
Applicant:
Amy Stokes, Operations Accountant
Description:
SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes

Permit Reviews

Permit Number - TC-MDP-0423-00935
Permit Status: Complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Start Date Submittal Complete Date Status  
12/05/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/06/2023 APPROVED Review Details
05/01/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 05/05/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0423-00935
Permit Status: Complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Date Description Comments
05/04/2023 Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents.
05/01/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
05/01/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
12/06/2023 ISSUED WITH PDEQ CONDITIONS: NO FINAL AND NO CERTIFICATE OF OCCUPANCY UNTIL THE PRIVATE SEWER #P21SD00033 IS ISSUED A DISCHARGE AUTHORIZATION BY PDEQ
05/01/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
12/06/2023 Post-Tension Inspection Report is required.
05/01/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
05/01/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
05/04/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0423-00935
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Total Completed Inspections - 22
Date Description Inspector Results Comments
05/26/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
05/26/2023 COT - RSPL - Rough Soil Passed
05/26/2023 COT - RSPL - Sewer Passed
06/12/2023 COT - RSBU - Preslab Passed
06/12/2023 COT - RSEL - Electrical Underground Passed
06/12/2023 COT - RSEL - Grounding/Bonding Passed
07/06/2023 COT - RSBU - Roof Nailing Passed
07/19/2023 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
08/17/2023 BULD - Electrical Clearance Passed
08/17/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
08/17/2023 COT - RSPL - Backwater Valve Passed
08/17/2023 COT - RSPL - Gas Pressure Test Passed
08/17/2023 COT - RSPL - Yard Water Line Passed
09/11/2023 COT - RSBU - Interior Shear Bracing Passed
10/30/2023 COT - BULD - SWG Clearance Passed SWG clearance issued
12/05/2023 COT - RSEL - Electrical Final Passed
12/05/2023 COT - RSEL - Outdoor Lighting Passed
12/05/2023 COT - RSME - Mechanical Final Passed
12/05/2023 COT - RSPL - Plumbing Final Passed
12/05/2023 ENGR Engineering Final Passed Contractor needs to clean up the grading on the north end of the building from the entrance gate back to the porch
12/05/2023 RSBU - Building Final Passed
12/05/2023 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
220365 - RINCON KNOLLS LOT 237 - PT REPORT-2023-12-04_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2023-04-27_V1.PDF DOCUMENTS VIEW