Permit: TC-MDP-0423-00932
Permit Details
Apply Date:
04/25/2023
Applicant:
David Martin
Description:
SFR K35G T21-M0033
Permit Reviews
Permit Number - TC-MDP-0423-00932
Permit Status: Complete
Permit Description: SFR K35G T21-M0033
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/12/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 05/16/2023 | APPROVED |
10/09/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/09/2023 | APPROVED |
11/01/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/02/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-MDP-0423-00932
Permit Status: Complete
Permit Description: SFR K35G T21-M0033
Date | Description | Comments |
---|---|---|
05/15/2023 | Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents. | |
05/15/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
05/15/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
05/15/2023 | Post-Installed Anchor Inspection Report is required. | |
04/27/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
06/15/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
06/15/2023 | Sewer condition must be accepted and released by Pima County | |
05/15/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0423-00932
Permite Description: SFR K35G T21-M0033
Total Outstanding Inspections - 4
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/09/2023 | COT - RSEL - Electrical Final | N/A | Re-inspection required | Missing receptacle at stop and drop counter. Exhaust fan at master bathroom not working. Install outdoor light south of garage. Insulate lines and level out condenser unit. Exhaust hood not completed. 10/9/2023 |
10/09/2023 | COT - RSEL - Outdoor Lighting | N/A | Re-inspection required | Missing receptacle at stop and drop counter. Exhaust fan at master bathroom not working. Install outdoor light south of garage. Insulate lines and level out condenser unit. Exhaust hood not completed. 10/9/2023 |
10/09/2023 | COT - RSME - Mechanical Final | N/A | Re-inspection required | Missing receptacle at stop and drop counter. Exhaust fan at master bathroom not working. Install outdoor light south of garage. Insulate lines and level out condenser unit. Exhaust hood not completed. 10/9/2023 |
10/09/2023 | RSBU - Building Final | N/A | Re-inspection required | Missing receptacle at stop and drop counter. Exhaust fan at master bathroom not working. Install outdoor light south of garage. Insulate lines and level out condenser unit. Exhaust hood not completed. 10/9/2023 |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0423-00932
Permit Description: SFR K35G T21-M0033
Total Completed Inspections - 22
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/13/2023 | COT - RSPL - Yard Water Line | Passed | Approved. Okay to backfill. Shading required. 6/13/2023 | |
06/14/2023 | COT - RSPL - Backwater Valve | Passed | Okay to backfill. Shading required. 6/14/2023 | |
06/14/2023 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading required. 6/14/2023 | |
06/14/2023 | COT - RSPL - Sewer | Passed | Okay to backfill. Shading required. 6/14/2023 | |
06/22/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
06/22/2023 | COT - RSBU - Preslab | Passed | ||
06/22/2023 | COT - RSEL - Electrical Underground | Passed | ||
06/22/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
07/10/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
07/10/2023 | COT - RSBU - Roof Nailing | Passed | ||
07/27/2023 | BULD - Electrical Clearance | Passed | TEP ECO | |
07/27/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
07/28/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
08/04/2023 | COT - RSBU - Interior Shear Bracing | Passed | Interior shear walls in garage and bedroom are properly screwed off. Okay to tape and texture all walls in home. | |
09/18/2023 | COT - BULD - SWG Clearance | Passed | ||
10/09/2023 | COT - RSPL - Plumbing Final | Passed | ||
10/09/2023 | RSBU - Building Progress | Passed | ||
10/09/2023 | ENGR Engineering Final | Passed | no side gate | |
10/17/2023 | COT - RSEL - Electrical Final | Passed | Corrections were made. 10/17/2023 | |
10/17/2023 | COT - RSEL - Outdoor Lighting | Passed | Corrections were made. 10/17/2023 | |
10/17/2023 | COT - RSME - Mechanical Final | Passed | Corrections were made. 10/17/2023 | |
10/17/2023 | RSBU - Building Final | Passed | Corrections were made. 10/17/2023 |