Permit: TC-MDP-0423-00927
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
12751 E LAUREN CANYON PL
Address NEW:
12751 E LAUREN CANYON PL
Apply Date:
05/11/2023
Applicant:
Amy Stokes, Operations Accountant
Description:
SFR RKM45R T21-M0093 (REVISION 2 Updated Structural cals and pages)
Permit Reviews
Permit Number - TC-MDP-0423-00927
Permit Status: Inspections complete
Permit Description: SFR RKM45R T21-M0093 (REVISION 2 Updated Structural cals and pages)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/19/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/20/2023 | APPROVED |
| 05/16/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 06/08/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0423-00927
Permit Status: Inspections complete
Permit Description: SFR RKM45R T21-M0093 (REVISION 2 Updated Structural cals and pages)
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 05/31/2023 | A retaining wall permit is required for any retaining walls over 4 feet from footer bottom to top of wall before permit final |
| 06/07/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-0423-00927
Permit Status: Inspections complete
Permit Description: SFR RKM45R T21-M0093 (REVISION 2 Updated Structural cals and pages)
| Date | Description | Comments |
|---|---|---|
| 05/16/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 05/16/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 05/16/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 09/20/2023 | Post-Tension Inspection Report is required. | |
| 04/27/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 05/16/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0423-00927
Permite Description: SFR RKM45R T21-M0093 (REVISION 2 Updated Structural cals and pages)
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/28/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Canceled | Cancelled per Chris. |
| 09/18/2023 | COT - RSPL - Gas Pressure Test | N/A | Re-inspection required | 9/18/23: Gas line not under pressure |
| 09/18/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 9/18/23: seal penetration through top plate at north end of house next to sliding door, block registers on three sides at bedroom in south west end of house, gas line not under pressure |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0423-00927
Permit Description: SFR RKM45R T21-M0093 (REVISION 2 Updated Structural cals and pages)
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/14/2023 | COT - RSPL - Sewer | Passed | ||
| 06/14/2023 | COT - RSPL - Rough Soil | Passed | ||
| 06/14/2023 | COT - RSPL - Backwater Valve | Passed | ||
| 06/29/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 06/29/2023 | COT - RSBU - Preslab | Passed | ||
| 06/29/2023 | COT - RSEL - Electrical Underground | Passed | ||
| 06/29/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
| 08/02/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 08/30/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 09/18/2023 | BULD - Electrical Clearance | Passed | 9/18/23: ECO TEP CLEARANCE | |
| 09/19/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
| 09/19/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 10/04/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 10/04/2023 | COT - RSPL - Yard Water Line | Passed | ||
| 11/15/2023 | COT - BULD - SWG Clearance | Passed | 11/15/23: SWG clearance issued. 12/14/23 clearance resent |
|
| 01/08/2024 | COT - RSEL - Electrical Final | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures. GFCI outlets are installed in kitchen, bathrooms, & garage. Electrical panel is properly labeled. | |
| 01/08/2024 | COT - RSEL - Outdoor Lighting | Passed | Exterior lights are installed per plans. | |
| 01/08/2024 | COT - RSME - Mechanical Final | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures. GFCI outlets are installed in kitchen, bathrooms, & garage. Electrical panel is properly labeled. | |
| 01/08/2024 | COT - RSPL - Plumbing Final | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures. GFCI outlets are installed in kitchen, bathrooms, & garage. Electrical panel is properly labeled. | |
| 01/08/2024 | RSBU - Building Final | Passed | Retaining walls are completed. | |
| 01/08/2024 | RSBU - Building Progress | Passed | ||
| 01/17/2024 | ENGR Engineering Final | Passed |