Permit: TC-MDP-0423-00916
Permit Details
Apply Date:
04/21/2023
Applicant:
Ramon VALDEZ
Description:
DUPLEX DUPLVAL82 T22-M0037
Permit Reviews
Permit Number - TC-MDP-0423-00916
Permit Status: Complete
Permit Description: DUPLEX DUPLVAL82 T22-M0037
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/12/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.2 | 06/14/2023 | REQUIRES RESUBMIT |
06/14/2023 | RESTAMP - RESIDENTIAL v.1 | 06/20/2023 | APPROVED |
06/14/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.3 | 06/14/2023 | APPROVED |
05/03/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 06/05/2023 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-MDP-0423-00916
Permit Status: Complete
Permit Description: DUPLEX DUPLVAL82 T22-M0037
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
06/05/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-0423-00916
Permit Status: Complete
Permit Description: DUPLEX DUPLVAL82 T22-M0037
Date | Description | Comments |
---|---|---|
05/03/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0423-00916
Permite Description: DUPLEX DUPLVAL82 T22-M0037
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/25/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Not Ready | Fire wall not complete, no DWV, no pressure on potable system |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0423-00916
Permit Description: DUPLEX DUPLVAL82 T22-M0037
Total Completed Inspections - 19
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/22/2023 | COT - RSPL - Rough Soil | Passed | ||
08/22/2023 | COT - RSPL - Sewer | Passed | ||
08/22/2023 | COT - RSPL - Yard Water Line | Passed | ||
08/23/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
08/23/2023 | COT - RSBU - Preslab | Passed | ||
08/23/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
09/18/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | Exterior shear wall is properly nailed off. Window flashing and windows are installed correctly. Door frames and doors are installed. Roof sheathing is installed and properly nailed off okay to dry-in roof and prepare for stucco installation. | |
09/18/2023 | COT - RSBU - Roof Nailing | Passed | Exterior shear wall is properly nailed off. Window flashing and windows are installed correctly. Door frames and doors are installed. Roof sheathing is installed and properly nailed off okay to dry-in roof and prepare for stucco installation. | |
09/25/2023 | RSBU - Building Progress | Passed | ||
10/03/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Approved intermediates for units #1 and #2, okay to insulate progress areas | |
10/04/2023 | BULD - Electrical Clearance | Passed | Approved 2 service panels at duplex, ECO Clearance to TEP is required for unit #1 and #2 11/21/23 clearance resent |
|
12/08/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
12/08/2023 | COT - RSEL - Electrical Final | Passed | ||
12/08/2023 | COT - RSEL - Electrical Underground | Passed | ||
12/08/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
12/08/2023 | COT - RSME - Mechanical Final | Passed | ||
12/08/2023 | COT - RSPL - Plumbing Final | Passed | ||
12/08/2023 | RSBU - Building Final | Passed | ||
12/08/2023 | ENGR Engineering Final | Passed |