Permit: TC-MDP-0423-00912
Permit Details
Status:
Issued
Type:
Model Building Permit
Address:
4532 S 6TH AV UNIT 1
Address NEW:
4532 S 6TH AV UNIT 1
Apply Date:
04/17/2023
Applicant:
Ramon VALDEZ
Description:
DUPLEX DUPLVAL82 T22-M0037
Permit Reviews
Permit Number - TC-MDP-0423-00912
Permit Status: Issued
Permit Description: DUPLEX DUPLVAL82 T22-M0037
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/28/2023 | RESTAMP - RESIDENTIAL v.1 | 06/29/2023 | APPROVED |
| 06/27/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.4 | 06/28/2023 | APPROVED |
| 06/02/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.3 | 06/20/2023 | REQUIRES RESUBMIT |
| 04/28/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 05/10/2023 | REQUIRES RESUBMIT |
| 05/19/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.2 | 05/22/2023 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-MDP-0423-00912
Permit Status: Issued
Permit Description: DUPLEX DUPLVAL82 T22-M0037
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 05/05/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-0423-00912
Permit Status: Issued
Permit Description: DUPLEX DUPLVAL82 T22-M0037
| Date | Description | Comments |
|---|---|---|
| 05/05/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-MDP-0423-00912
Permite Description: DUPLEX DUPLVAL82 T22-M0037
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/14/2023 | COT - RSBU - Preslab | N/A | Re-inspection required | 7/14/23: Properly compact soil. Rebar must be 3" away from earth throughout. |
| 07/14/2023 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Re-inspection required | 7/14/23: Properly compact soil. Rebar must be 3" away from earth throughout. |
| 08/21/2023 | COT - RSBU - Interior Shear Bracing | N/A | Not Ready | 8/21/23 Not ready |
| 08/21/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Not Ready | 8/21/23 Not ready |
| 08/21/2023 | COT - RSBU - Roof Nailing | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0423-00912
Permit Description: DUPLEX DUPLVAL82 T22-M0037
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/12/2023 | COT - RSPL - Rough Soil | Passed | Rough-in for underground plumbing is complete and under a hydrostatic pressure test with no leaks. Okay to shade pipes and backfill with compacted existing soil. | |
| 07/12/2023 | COT - RSPL - Sewer | Passed | Underground plumbing is connected to main sewer line and under a hydrostatic pressure test. Okay to backfill sewer line trench. | |
| 07/14/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
| 07/17/2023 | COT - RSBU - Preslab | Passed | 7/14/23: Properly compact soil. Rebar must be 3" away from earth throughout. 7/17/23: corrections made |
|
| 07/17/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 7/14/23: Properly compact soil. Rebar must be 3" away from earth throughout. 7/17/23: corrections made |
|
| 08/21/2023 | COT - RSBU - Firewall/Fire Barrier/Firestop | Passed | ||
| 08/28/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 08/28/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 08/28/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 09/01/2023 | BULD - Electrical Clearance | Passed | 9/1/23: ECO TEP CLEARANCE | |
| 09/01/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 9/1/23: ok to insulate | |
| 09/01/2023 | COT - RSPL - Yard Water Line | Passed | ||
| 12/18/2023 | COT - RSEL - Electrical Final | Passed | ||
| 12/18/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
| 12/18/2023 | COT - RSME - Mechanical Final | Passed | ||
| 12/18/2023 | COT - RSPL - Plumbing Final | Passed | ||
| 12/18/2023 | RSBU - Building Final | Passed | ||
| 12/18/2023 | RSBU - Building Progress | Passed | ||
| 12/18/2023 | ENGR Engineering Final | Passed | ||
| 12/18/2023 | SITE - Zoning Final | Passed |