Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
03/05/2024
Applicant:
Celina Rodriguez
Description:
SFR BT2591-140 T22-M0033

Permit Reviews

Permit Number - TC-MDP-0423-00907
Permit Status: Inspections complete
Permit Description: SFR BT2591-140 T22-M0033
Start Date Submittal Complete Date Status  
03/06/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 03/18/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0423-00907
Permit Status: Inspections complete
Permit Description: SFR BT2591-140 T22-M0033
Total Outstanding Activity Conditions - 6
Date Name
03/08/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
03/18/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
03/18/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
03/18/2024 Post-Installed Anchor Inspection Report is required.
03/18/2024 Post-Tension Inspection Report is required.
03/18/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0423-00907
Permit Status: Inspections complete
Permit Description: SFR BT2591-140 T22-M0033
Date Description Comments
04/13/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0423-00907
Permit Description: SFR BT2591-140 T22-M0033
Total Completed Inspections - 21
Date Description Inspector Results Comments
04/25/2024 COT - RSPL - Rough Soil Passed
04/25/2024 COT - RSPL - Sewer Passed
04/25/2024 COT - RSPL - Yard Water Line Passed
05/03/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
05/03/2024 COT - RSBU - Preslab Passed
05/03/2024 COT - RSEL - Electrical Underground Passed
05/03/2024 COT - RSEL - Grounding/Bonding Passed
05/23/2024 COT - RSBU - Roof Nailing Passed
05/29/2024 COT - RSBU - Exterior Clips/Sheathing Passed
06/25/2024 COT - RSPL - Gas Pressure Test Passed
06/28/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 6/28/24: DWV is under a water test with no leaks, register in master bedroom has been blocked. Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with installation of insulation and drywall.
07/22/2024 COT - RSBU - Interior Shear Bracing Passed Drywall on interior shear walls is properly installed and secured to studs per plan requirements. Okay to proceed with tape, texture, and paint of all walls and ceilings.
08/06/2024 BULD - Electrical Clearance Passed TEP ECO
08/30/2024 COT - BULD - SWG Clearance Passed 8/30/24: Water heater is installed and gas valve/sediment trap installed. Okay to install meter and turn on gas.
10/03/2024 COT - RSEL - Electrical Final Passed Electrical final approved.
10/03/2024 COT - RSEL - Outdoor Lighting Passed Outdoor lighting approved.
10/03/2024 COT - RSME - Mechanical Final Passed All mechanical approved.
10/03/2024 COT - RSPL - Plumbing Final Passed All plumbing fixtures in operating condition.
10/03/2024 ENGR Engineering Final Passed CO Ready
10/03/2024 RSBU - Building Final Passed 10-3-24, final building inspection approved.
10/03/2024 RSBU - Building Progress Passed