Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
02/22/2024
Applicant:
Celina Rodriguez
Description:
SFR BT2591-140 T22-M0033

Permit Reviews

Permit Number - TC-MDP-0423-00905
Permit Status: Inspections complete
Permit Description: SFR BT2591-140 T22-M0033
Start Date Submittal Complete Date Status  
02/27/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 03/11/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0423-00905
Permit Status: Inspections complete
Permit Description: SFR BT2591-140 T22-M0033
Total Outstanding Activity Conditions - 5
Date Name
03/08/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
03/08/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
03/08/2024 Post-Installed Anchor Inspection Report is required.
03/08/2024 Post-Tension Inspection Report is required.
03/08/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0423-00905
Permit Status: Inspections complete
Permit Description: SFR BT2591-140 T22-M0033
Date Description Comments
04/13/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0423-00905
Permit Description: SFR BT2591-140 T22-M0033
Total Completed Inspections - 21
Date Description Inspector Results Comments
03/21/2024 COT - RSPL - Yard Water Line Passed
03/21/2024 COT - RSPL - Rough Soil Passed
03/21/2024 COT - RSPL - Sewer Passed
04/09/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
04/09/2024 COT - RSBU - Preslab Passed
04/09/2024 COT - RSEL - Electrical Underground Passed
04/09/2024 COT - RSEL - Grounding/Bonding Passed
04/24/2024 COT - RSBU - Exterior Clips/Sheathing Passed Masa clips and shear wall clips are properly nailed, base plates are shot/bolted/cut nailed down to the concrete floor. Sheathing for shear walls are properly nailed to the studs. Okay to proceed with window installation.
04/24/2024 COT - RSBU - Roof Nailing Passed Roof trusses are properly secured to top plate with H2.5 clips. Plywood sheathing is properly secured to roof trusses and nailed per plans. Okay to dry-in roof.
05/20/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
05/20/2024 COT - RSPL - Gas Pressure Test Passed
06/07/2024 COT - RSBU - Interior Shear Bracing Passed
08/02/2024 BULD - Electrical Clearance Passed TEP issued an ECO Clearance. Okay to energize panel.
08/12/2024 COT - BULD - SWG Clearance Passed Gas valves are installed at water heater and furnace. Okay to install meter and turn on gas. SWG Clearance issued to Southwest Gas Company.
08/27/2024 RSBU - Building Progress Passed
08/27/2024 COT - RSEL - Electrical Final Passed
08/27/2024 COT - RSEL - Outdoor Lighting Passed
08/27/2024 COT - RSME - Mechanical Final Passed
08/27/2024 ENGR Engineering Final Passed
08/27/2024 COT - RSPL - Plumbing Final Passed
08/28/2024 RSBU - Building Final Passed 8/28/24: Engineering Final completed today. Construction of house is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Electrical panel is properly labeled with AFCI/GFCI breakers installed as required. Breakers for A/C unit is properly sized per manufacturer specifications. Outdoor lighting is properly installed per plans and city regulations. Okay to issue Certificate of Occupancy.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA PHASE 2 - LOT 16 START_V1.PDF DOCUMENTS VIEW
BTII 16 SIC-2024-02-22_V1.PDF DOCUMENTS VIEW