Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0423-00889
Permit Details
Apply Date:
07/12/2023
Applicant:
Daria Hopkins
Description:
SFR MER1502580 T21-M0076 REV1 roof covering change
Permit Reviews
Permit Number - TC-MDP-0423-00889
Permit Status: Issued
Permit Description: SFR MER1502580 T21-M0076 REV1 roof covering change
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/26/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/26/2024 | APPROVED |
07/12/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 07/13/2023 | APPROVED |
10/02/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/02/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0423-00889
Permit Status: Issued
Permit Description: SFR MER1502580 T21-M0076 REV1 roof covering change
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
09/30/2024 | A building permit for the retaining wall is required prior to finalization |
Conditions
Permit Number - TC-MDP-0423-00889
Permit Status: Issued
Permit Description: SFR MER1502580 T21-M0076 REV1 roof covering change
Date | Description | Comments |
---|---|---|
10/02/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
07/12/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
07/12/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
10/02/2023 | Post-Tension Inspection Report is required. | |
04/12/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
07/12/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0423-00889
Permit Description: SFR MER1502580 T21-M0076 REV1 roof covering change
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/24/2023 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading is required. 11/24/2023 | |
11/24/2023 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading is required. 11/24/2023 | |
11/24/2023 | COT - RSPL - Sewer | Passed | Okay to backfill. Shading is required. 11/24/2023 | |
12/05/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
12/05/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
12/05/2023 | COT - RSEL - Electrical Underground | Passed | ||
12/05/2023 | COT - RSBU - Preslab | Passed | ||
02/06/2024 | COT - RSBU - Roof Nailing | Passed | ||
02/06/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
02/26/2024 | BULD - Electrical Clearance | Passed | ECO Clearance issued for panel to be energized by TEP. | |
02/26/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Mechanical, electrical, and plumbing rough-in is complete, framing is complete. Okay to proceed with installation of insulation and drywall. | |
02/26/2024 | COT - RSPL - Gas Pressure Test | Passed | Gas lines are properly installed and supported. Gas line is under 15# compressed air without any leaks. Okay to proceed with covering up gas line. | |
02/26/2024 | RSBU - Building Progress | Passed | Rough framing, rough-in of mechanical, electrical, and plumbing are complete, styrofoam and wire are installed on exterior walls, windows are installed, and Gasline is under a pressure test. Okay to proceed with insulation and drywall installation. | |
03/13/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
05/08/2024 | COT - BULD - SWG Clearance | Passed | ||
05/20/2024 | COT - RSEL - Electrical Final | Passed | ||
05/20/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
05/20/2024 | RSBU - Building Final | Passed | ||
05/20/2024 | ENGR Engineering Final | Passed | ||
05/20/2024 | COT - RSPL - Plumbing Final | Passed | ||
05/20/2024 | COT - RSME - Mechanical Final | Passed |