Permit Number - TC-MDP-0423-00888
Permit Status: Complete
Permit Description: SFR MER1502580 T21-M0076 REV1 roof covering change
Start Date Submittal Complete Date Status  
07/19/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/22/2024 APPROVED Review Details
02/01/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 02/07/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0423-00888
Permit Status: Complete
Permit Description: SFR MER1502580 T21-M0076 REV1 roof covering change
Date Description Comments
02/01/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
02/01/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
02/01/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
02/07/2024 Post-Tension Inspection Report is required.
04/12/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/22/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
02/07/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0423-00888
Permit Description: SFR MER1502580 T21-M0076 REV1 roof covering change
Total Completed Inspections - 21
Date Description Inspector Results Comments
05/22/2024 COT - RSPL - Yard Water Line Passed Water line is connected to the main water meter and is under street pressure. Blue tracer wire is installed from meter to house. Okay to shade pipe and backfill trench.
05/22/2024 COT - RSPL - Sewer Passed Underground plumbing and sewer line are connected and under a 10' water test with no leaks. Okay to shade pipes and backfill trenches.
05/22/2024 COT - RSPL - Rough Soil Passed Underground plumbing and sewer line are connected and under a 10' water test with no leaks. Okay to shade pipes and backfill trenches.
06/07/2024 COT - RSBU - Preslab Passed
06/07/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
06/07/2024 COT - RSEL - Grounding/Bonding Passed
06/07/2024 COT - RSEL - Electrical Underground Passed
06/21/2024 COT - RSBU - Exterior Clips/Sheathing Passed
06/21/2024 COT - RSBU - Roof Nailing Passed
07/19/2024 BULD - Electrical Clearance Passed
07/19/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
07/19/2024 COT - RSPL - Gas Pressure Test Passed
08/01/2024 COT - RSBU - Interior Shear Bracing Passed
09/20/2024 COT - BULD - SWG Clearance Passed SWG for meter only
10/03/2024 COT - RSEL - Electrical Final Passed
10/03/2024 COT - RSEL - Outdoor Lighting Passed
10/03/2024 COT - RSME - Mechanical Final Passed
10/03/2024 COT - RSPL - Plumbing Final Passed
10/03/2024 ENGR Engineering Final Passed
10/03/2024 RSBU - Building Final Passed
10/03/2024 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
148105 PT LOT 72 COMPLETE-2024-07-18_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 72 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 72 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 72 SPECIAL INSPECTION CERTIFICATE-2024-02-01_V1.PDF DOCUMENTS VIEW