Permit: TC-MDP-0423-00887
Permit Details
Apply Date:
06/23/2023
Applicant:
Daria Hopkins
Description:
SFR MER1502580 T21-M0076 REV1 roof covering change
Permit Reviews
Permit Number - TC-MDP-0423-00887
Permit Status: Complete
Permit Description: SFR MER1502580 T21-M0076 REV1 roof covering change
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/17/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/18/2024 | APPROVED |
03/26/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/26/2024 | APPROVED |
09/29/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/02/2023 | APPROVED |
06/28/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 06/30/2023 | APPROVED |
Conditions
Permit Number - TC-MDP-0423-00887
Permit Status: Complete
Permit Description: SFR MER1502580 T21-M0076 REV1 roof covering change
Date | Description | Comments |
---|---|---|
10/02/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
06/28/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
06/28/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
10/02/2023 | Post-Tension Inspection Report is required. | |
04/12/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
06/20/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
10/18/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
06/30/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0423-00887
Permite Description: SFR MER1502580 T21-M0076 REV1 roof covering change
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/21/2024 | RSBU - Building Progress | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0423-00887
Permit Description: SFR MER1502580 T21-M0076 REV1 roof covering change
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/08/2024 | COT - RSPL - Backwater Valve | Passed | ||
01/08/2024 | COT - RSPL - Rough Soil | Passed | ||
01/08/2024 | COT - RSPL - Yard Water Line | Passed | ||
01/08/2024 | COT - RSPL - Sewer | Passed | ||
01/17/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Ufer ground is in place, post tension cabling is installed and properly supported, rebar reinforcement is installed where required per plans, all plumbing pipes are properly protected with foam wrap or plastic boxes, and all shear wall clips are installed and properly supported. | |
01/17/2024 | COT - RSBU - Preslab | Passed | Ufer ground is in place, post tension cabling is installed and properly supported, rebar reinforcement is installed where required per plans, all plumbing pipes are properly protected with foam wrap or plastic boxes, and all shear wall clips are installed and properly supported. | |
01/17/2024 | COT - RSEL - Grounding/Bonding | Passed | Ufer ground is in place, post tension cabling is installed and properly supported, rebar reinforcement is installed where required per plans, all plumbing pipes are properly protected with foam wrap or plastic boxes, and all shear wall clips are installed and properly supported. | |
01/29/2024 | COT - RSEL - Electrical Underground | Passed | ||
02/26/2024 | COT - RSBU - Roof Nailing | Passed | Roof trusses and sheathing are properly installed and nailed down. H2.5 clips are installed on every truss. Base plate is properly bolted down on shear walls and edge clips are installed and nailed off on base plates. Okay to dry in roof and walls. | |
02/26/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | Roof trusses and sheathing are properly installed and nailed down. H2.5 clips are installed on every truss. Base plate is properly bolted down on shear walls and edge clips are installed and nailed off on base plates. Okay to dry in roof and walls. | |
03/18/2024 | BULD - Electrical Clearance | Passed | 3/18/24: Electrical panel is properly installed and grounded to Ufer ground. Okay to energize panel. TEP ECO CLEARANCE issued. | |
03/18/2024 | COT - RSPL - Gas Pressure Test | Passed | PASSED: Gas line is holding 15 pounds of air. Okay to proceed. | |
03/21/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
04/11/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
06/12/2024 | COT - BULD - SWG Clearance | Passed | Gas valves are installed in kitchen for range, laundry room for clothes dryer, and in garage for water heater. Okay to install meter. SWG Clearance given to Southwest Gas. | |
06/18/2024 | COT - RSEL - Electrical Final | Passed | Pass | |
06/18/2024 | COT - RSEL - Outdoor Lighting | Passed | Pass | |
06/18/2024 | COT - RSME - Mechanical Final | Passed | ||
06/18/2024 | COT - RSPL - Plumbing Final | Passed | Pass | |
06/18/2024 | RSBU - Building Final | Passed | ||
06/18/2024 | ENGR Engineering Final | Passed |