Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
01/17/2024
Applicant:
Dana Petty
Description:
SFR MER1502580 T21-M0076 REV1 roof covering change

Permit Reviews

Permit Number - TC-MDP-0423-00886
Permit Status: Complete
Permit Description: SFR MER1502580 T21-M0076 REV1 roof covering change
Start Date Submittal Complete Date Status  
06/14/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/17/2024 APPROVED Review Details
09/26/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/26/2024 APPROVED Review Details
01/18/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 01/24/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0423-00886
Permit Status: Complete
Permit Description: SFR MER1502580 T21-M0076 REV1 roof covering change
Date Description Comments
01/18/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
01/18/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
01/18/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/23/2024 Post-Tension Inspection Report is required.
04/12/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
01/18/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
06/17/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
01/23/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0423-00886
Permit Description: SFR MER1502580 T21-M0076 REV1 roof covering change
Total Completed Inspections - 21
Date Description Inspector Results Comments
04/05/2024 COT - RSPL - Yard Water Line Passed
04/05/2024 COT - RSPL - Sewer Passed
04/05/2024 COT - RSPL - Rough Soil Passed
04/18/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
04/18/2024 COT - RSBU - Preslab Passed
04/18/2024 COT - RSEL - Electrical Underground Passed
04/18/2024 COT - RSEL - Grounding/Bonding Passed
05/06/2024 COT - RSBU - Exterior Clips/Sheathing Passed Exterior walls are properly secured to floor with red head bolts, shot pins, or masa clips. Shear wall hold down is properly installed in garage wall between garage and house. Okay to proceed with windows and door frames installation and stucco dry-in application.
05/06/2024 COT - RSBU - Roof Nailing Passed Roof trusses are properly installed and secured to the top plate with nails and H2.5 clips. Plywood sheathing is installed and properly nailed to trusses per code.
06/03/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with other work.
06/03/2024 COT - RSPL - Gas Pressure Test Passed Gas line is holding 10 pounds of compressed air with no leaks. Okay to proceed with next phase of construction.
06/03/2024 BULD - Electrical Clearance Passed 6/3/24: The address label has been installed on the electrical panel. Ground wires are attached to Ufer ground and gas pipe line.
06/25/2024 COT - RSBU - Interior Shear Bracing Passed
08/20/2024 COT - BULD - SWG Clearance Passed SWG FOR METER ONLYM
08/28/2024 COT - RSEL - Electrical Final Passed Construction of house is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Electrical panel is properly labeled with AFCI/GFCI breakers installed as required. Breakers for A/C unit is properly sized per manufacturer specifications. Outdoor lighting is properly installed per plans and city regulations. Okay to issue Certificate of Occupancy.
08/28/2024 COT - RSEL - Outdoor Lighting Passed Outdoor lighting is properly installed per plans and city regulations.
08/28/2024 COT - RSME - Mechanical Final Passed Construction of house is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Electrical panel is properly labeled with AFCI/GFCI breakers installed as required. Breakers for A/C unit is properly sized per manufacturer specifications. Outdoor lighting is properly installed per plans and city regulations. Okay to issue Certificate of Occupancy.
08/28/2024 COT - RSPL - Plumbing Final Passed Construction of house is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Electrical panel is properly labeled with AFCI/GFCI breakers installed as required. Breakers for A/C unit is properly sized per manufacturer specifications. Outdoor lighting is properly installed per plans and city regulations. Okay to issue Certificate of Occupancy.
08/28/2024 ENGR Engineering Final Passed
08/28/2024 RSBU - Building Final Passed Construction of house is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Electrical panel is properly labeled with AFCI/GFCI breakers installed as required. Breakers for A/C unit is properly sized per manufacturer specifications. Outdoor lighting is properly installed per plans and city regulations. Okay to issue Certificate of Occupancy.
08/28/2024 RSBU - Building Progress Passed Construction of house is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Electrical panel is properly labeled with AFCI/GFCI breakers installed as required. Breakers for A/C unit is properly sized per manufacturer specifications. Outdoor lighting is properly installed per plans and city regulations. Okay to issue Certificate of Occupancy.

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
147043 PT LOT 77 COMPLETE-2024-06-11_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 77 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 77 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 77 SPECIAL INSPECTION CERTIFICATE-2024-01-17_V1.PDF DOCUMENTS VIEW