Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
05/04/2023
Applicant:
Daria Hopkins
Description:
SFR MER1402190 T21-M0078

Permit Reviews

Permit Number - TC-MDP-0423-00874
Permit Status: Complete
Permit Description: SFR MER1402190 T21-M0078
Start Date Submittal Complete Date Status  
08/19/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/20/2024 APPROVED Review Details
05/04/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 05/08/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0423-00874
Permit Status: Complete
Permit Description: SFR MER1402190 T21-M0078
Date Description Comments
05/05/2023 Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents.
05/04/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
05/04/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/12/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
08/20/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
05/04/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
05/05/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0423-00874
Permit Description: SFR MER1402190 T21-M0078
Total Completed Inspections - 21
Date Description Inspector Results Comments
06/30/2023 COT - RSPL - Yard Water Line Passed
07/03/2023 COT - RSPL - Rough Soil Passed
07/17/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
07/17/2023 COT - RSBU - Preslab Passed
07/17/2023 COT - RSEL - Electrical Underground Passed
07/17/2023 COT - RSEL - Grounding/Bonding Passed
08/08/2023 COT - RSBU - Exterior Clips/Sheathing Passed
08/08/2023 COT - RSBU - Roof Nailing Passed
10/04/2023 BULD - Electrical Clearance Passed TEP ECO
10/04/2023 COT - RSPL - Gas Pressure Test Passed
10/04/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
11/02/2023 COT - RSBU - Interior Shear Bracing Passed
11/20/2023 COT - RSPL - Sewer Passed
01/10/2024 COT - BULD - SWG Clearance Passed
01/17/2024 RSBU - Building Progress Passed work crews are finishing final painting, clean-up, trim out.
01/29/2024 COT - RSEL - Electrical Final Passed
01/29/2024 COT - RSEL - Outdoor Lighting Passed
01/25/2024 COT - RSME - Mechanical Final Passed
01/25/2024 COT - RSPL - Plumbing Final Passed
01/25/2024 RSBU - Building Final Passed
03/07/2024 ENGR Engineering Final Passed landscaping trees not properly staked, move wire supports higher up tree,

grade cert present as “passed”,

remove nursery stakes from backyard trees, and see first comment, above.

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
LOT 113 FINAL SPECIAL INSPECTION CERTIFICATE-2024-08-15_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 113 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 113 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 113 SPECIAL INSPECTION CERTIFICATE-2023-05-04_V1.PDF DOCUMENTS VIEW