Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
05/23/2023
Applicant:
Mark Alteri
Description:
SFR PVCS1041 T22-M0050

Permit Reviews

Permit Number - TC-MDP-0423-00869
Permit Status: Complete
Permit Description: SFR PVCS1041 T22-M0050
Start Date Submittal Complete Date Status  
05/24/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 06/09/2023 APPROVED Review Details
10/25/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 10/30/2023 APPROVED Review Details
10/16/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/17/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0423-00869
Permit Status: Complete
Permit Description: SFR PVCS1041 T22-M0050
Date Description Comments
01/03/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
10/17/2023 Post-Tension Inspection Report is required.
04/07/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/09/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0423-00869
Permite Description: SFR PVCS1041 T22-M0050
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
10/19/2023 COT - RSBU - Interior Shear Bracing N/A Re-inspection required
10/19/2023 COT - RSBU - Firewall/Fire Barrier/Firestop N/A Re-inspection required not ready

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0423-00869
Permit Description: SFR PVCS1041 T22-M0050
Total Completed Inspections - 23
Date Description Inspector Results Comments
06/21/2023 COT - RSPL - Yard Water Line Passed
06/21/2023 COT - RSPL - Sewer Passed
06/21/2023 COT - RSPL - Rough Soil Passed
06/21/2023 COT - RSPL - Backwater Valve Passed
06/27/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
06/27/2023 COT - RSBU - Preslab Passed
06/27/2023 COT - RSEL - Grounding/Bonding Passed
07/21/2023 COT - RSBU - Exterior Clips/Sheathing Passed
07/21/2023 COT - RSBU - Roof Nailing Passed
09/15/2023 COT - RSPL - Gas Pressure Test Passed
09/20/2023 BULD - Electrical Clearance Passed TEP ECO
09/20/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
10/20/2023 COT - RSBU - Interior Shear Bracing Passed 10/20/23: All interior walls approved to tape.
10/20/2023 COT - RSBU - Firewall/Fire Barrier/Firestop Passed 10/20/23: north interior 1-hour walls approved to tape.
12/11/2023 COT - BULD - SWG Clearance Passed SWG clearance issued
12/11/2023 COT - RSEL - Electrical Final Passed
12/11/2023 COT - RSEL - Electrical Underground Passed
12/11/2023 COT - RSEL - Outdoor Lighting Passed
12/11/2023 COT - RSME - Mechanical Final Passed
12/11/2023 COT - RSPL - Plumbing Final Passed
12/11/2023 RSBU - Building Final Passed
12/11/2023 RSBU - Building Progress Passed
12/12/2023 ENGR Engineering Final Passed Note, cut clean outs flush with gravel on side of driveway

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CBT 2 REVISED PP FOR PERMIT_V1.PDF DOCUMENTS VIEW
CBT LOT 2 REVISION NARRATIVE_V1.PDF DOCUMENTS VIEW
PT REPORT LOT 2-2023-10-16_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CBT 2 PP FOR PERMIT_V1.PDF DOCUMENTS VIEW
CBT LOT 2 PT CERT-2023-05-23_V1.PDF DOCUMENTS VIEW