Permit Details

Status:
Complete
Type:
Model Building Permit
Address:
1850 S POETRY LN
Apply Date:
05/03/2023
Applicant:
Mark Alteri
Description:
SFR CVPLAN3 T22-M0044

Permit Reviews

Permit Number - TC-MDP-0423-00868
Permit Status: Complete
Permit Description: SFR CVPLAN3 T22-M0044
Start Date Submittal Complete Date Status  
05/04/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 05/05/2023 APPROVED Review Details
09/21/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/21/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0423-00868
Permit Status: Complete
Permit Description: SFR CVPLAN3 T22-M0044
Date Description Comments
05/05/2023 Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents.
05/04/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/21/2023 Post-Tension Inspection Report is required.
05/04/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
05/05/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0423-00868
Permit Description: SFR CVPLAN3 T22-M0044
Total Completed Inspections - 22
Date Description Inspector Results Comments
05/31/2023 COT - RSPL - Backwater Valve Passed
05/31/2023 COT - RSPL - Rough Soil Passed
05/31/2023 COT - RSPL - Sewer Passed Approved connected to main, okay to backfill
05/31/2023 COT - RSPL - Yard Water Line Passed Approved, okay to shade cover progress areas
06/05/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
06/05/2023 COT - RSBU - Preslab Passed
06/05/2023 COT - RSEL - Electrical Underground Passed
06/05/2023 COT - RSEL - Grounding/Bonding Passed
07/17/2023 COT - RSBU - Roof Nailing Passed
07/17/2023 COT - RSBU - Exterior Clips/Sheathing Passed
08/23/2023 BULD - Electrical Clearance Passed TEP ECO
09/15/2023 COT - RSPL - Gas Pressure Test Passed
09/21/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
10/16/2023 COT - RSBU - Interior Shear Bracing Passed Interior shear walls in garage and 2nd floor are properly screwed off 7" apart. Okay to tape and texture walls.
12/11/2023 COT - BULD - SWG Clearance Passed SWG clearance issued
12/11/2023 COT - RSEL - Electrical Final Passed
12/11/2023 COT - RSEL - Outdoor Lighting Passed
12/11/2023 COT - RSME - Mechanical Final Passed
12/11/2023 COT - RSPL - Plumbing Final Passed
12/11/2023 RSBU - Building Final Passed
12/11/2023 RSBU - Building Progress Passed
12/12/2023 ENGR Engineering Final Passed 1) no address posted

FYI, Exterior of homes must be move in ready

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
PT REPORT LOT 30-2023-09-20_V1.PDF DOCUMENTS VIEW
CBT 30 PT CERT-2023-05-03_V1.PDF DOCUMENTS VIEW
LOT 30 PP FOR PERMIT_V1.PDF DOCUMENTS VIEW