Permit: TC-MDP-0423-00866
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
1812 S TEACHERS ROW LN
Address NEW:
1812 S TEACHERS ROW LN
Apply Date:
07/17/2023
Applicant:
Mark Alteri
Description:
PVCS1500 T22-M0040 SFR
Permit Reviews
Permit Number - TC-MDP-0423-00866
Permit Status: Complete
Permit Description: PVCS1500 T22-M0040 SFR
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/01/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/02/2023 | APPROVED |
| 07/17/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 07/18/2023 | APPROVED |
Conditions
Permit Number - TC-MDP-0423-00866
Permit Status: Complete
Permit Description: PVCS1500 T22-M0040 SFR
| Date | Description | Comments |
|---|---|---|
| 07/17/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 03/16/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 07/17/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0423-00866
Permite Description: PVCS1500 T22-M0040 SFR
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/12/2024 | ENGR Engineering Final | N/A | Partial Pass | Contractor need to put hand railing from the street to the entryway of this house. The first step is 11% the second one is 7.1. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0423-00866
Permit Description: PVCS1500 T22-M0040 SFR
Total Completed Inspections - 23
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/15/2023 | COT - RSPL - Backwater Valve | Passed | ||
| 08/15/2023 | COT - RSPL - Rough Soil | Passed | Note: Unable to verify setbacks at this time; only one survey stake visible. | |
| 08/15/2023 | COT - RSPL - Sewer | Passed | Note: Unable to verify setbacks at this time; only one survey stake visible. | |
| 08/15/2023 | COT - RSPL - Yard Water Line | Passed | ||
| 08/22/2023 | COT - RSBU - Preslab | Passed | ||
| 08/22/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 08/22/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
| 10/02/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 10/04/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 11/06/2023 | BULD - Electrical Clearance | Passed | Electrical panel is properly installed, conduit sweep from meter box to transformer is in place. ECO Electrical Clearance issued for unit. Okay to energize power system. | |
| 11/15/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 11/16/2023 | RSBU - Building Progress | Passed | ||
| 12/01/2023 | COT - RSPL - Gas Pressure Test | Passed | Gas piping is under air pressure and holding 15# psi.. | |
| 12/11/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 12/21/2023 | COT - RSBU - Firewall/Fire Barrier/Firestop | Passed | ||
| 02/26/2024 | COT - BULD - SWG Clearance | Passed | 2/26/24: SWG clearance for meter | |
| 03/06/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 03/06/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
| 03/06/2024 | COT - RSPL - Plumbing Final | Passed | ||
| 03/12/2024 | COT - RSEL - Electrical Final | Passed | ||
| 03/12/2024 | COT - RSME - Mechanical Final | Passed | ||
| 03/12/2024 | RSBU - Building Final | Passed | ||
| 03/21/2024 | ENGR Engineering Final | Passed |