Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
07/17/2023
Applicant:
Stephanie Bebee
Description:
PVCS1500 T22-M0040 SFR

Permit Reviews

Permit Number - TC-MDP-0423-00866
Permit Status: Complete
Permit Description: PVCS1500 T22-M0040 SFR
Start Date Submittal Complete Date Status  
11/01/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/02/2023 APPROVED Review Details
07/17/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 07/18/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0423-00866
Permit Status: Complete
Permit Description: PVCS1500 T22-M0040 SFR
Date Description Comments
07/17/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
03/16/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/17/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0423-00866
Permite Description: PVCS1500 T22-M0040 SFR
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
03/12/2024 ENGR Engineering Final N/A Partial Pass Contractor need to put hand railing from the street to the entryway of this house. The first step is 11% the second one is 7.1.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0423-00866
Permit Description: PVCS1500 T22-M0040 SFR
Total Completed Inspections - 23
Date Description Inspector Results Comments
08/15/2023 COT - RSPL - Backwater Valve Passed
08/15/2023 COT - RSPL - Rough Soil Passed Note: Unable to verify setbacks at this time; only one survey stake visible.
08/15/2023 COT - RSPL - Sewer Passed Note: Unable to verify setbacks at this time; only one survey stake visible.
08/15/2023 COT - RSPL - Yard Water Line Passed
08/22/2023 COT - RSBU - Preslab Passed
08/22/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
08/22/2023 COT - RSEL - Grounding/Bonding Passed
10/02/2023 COT - RSBU - Roof Nailing Passed
10/04/2023 COT - RSBU - Exterior Clips/Sheathing Passed
11/06/2023 BULD - Electrical Clearance Passed Electrical panel is properly installed, conduit sweep from meter box to transformer is in place. ECO Electrical Clearance issued for unit. Okay to energize power system.
11/15/2023 COT - RSBU - Interior Shear Bracing Passed
11/16/2023 RSBU - Building Progress Passed
12/01/2023 COT - RSPL - Gas Pressure Test Passed Gas piping is under air pressure and holding 15# psi..
12/11/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
12/21/2023 COT - RSBU - Firewall/Fire Barrier/Firestop Passed
02/26/2024 COT - BULD - SWG Clearance Passed 2/26/24: SWG clearance for meter
03/06/2024 COT - RSEL - Electrical Underground Passed
03/06/2024 COT - RSEL - Outdoor Lighting Passed
03/06/2024 COT - RSPL - Plumbing Final Passed
03/12/2024 COT - RSEL - Electrical Final Passed
03/12/2024 COT - RSME - Mechanical Final Passed
03/12/2024 RSBU - Building Final Passed
03/21/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
CBT 12 PT REPOERT-2023-11-01_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CBT 12 PP FOR PERMIT_V1.PDF DOCUMENTS VIEW
CBT 12 PT CERT-2023-07-17_V1.PDF DOCUMENTS VIEW