Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
05/23/2023
Applicant:
Mark Alteri
Description:
PVCS1500 T22-M0040 SFR

Permit Reviews

Permit Number - TC-MDP-0423-00865
Permit Status: Complete
Permit Description: PVCS1500 T22-M0040 SFR
Start Date Submittal Complete Date Status  
09/21/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/21/2023 APPROVED Review Details
05/24/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 06/09/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0423-00865
Permit Status: Complete
Permit Description: PVCS1500 T22-M0040 SFR
Date Description Comments
05/24/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/21/2023 Post-Tension Inspection Report is required.
09/21/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/09/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0423-00865
Permite Description: PVCS1500 T22-M0040 SFR
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
08/21/2023 COT - RSBU - Exterior Clips/Sheathing N/A Re-inspection required Not ready. Missing blocking at exterior soffit. Missing rsp clips at north end of garage. Shear wall at west end of bedroom Not per length. 8/21/2023
11/21/2023 COT - RSBU - Firewall/Fire Barrier/Firestop N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0423-00865
Permit Description: PVCS1500 T22-M0040 SFR
Total Completed Inspections - 23
Date Description Inspector Results Comments
06/26/2023 COT - RSPL - Sewer Passed
06/26/2023 COT - RSPL - Yard Water Line Passed
06/26/2023 COT - RSPL - Rough Soil Passed
06/26/2023 COT - RSPL - Backwater Valve Passed
06/30/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
06/30/2023 COT - RSBU - Preslab Passed
06/30/2023 COT - RSEL - Grounding/Bonding Passed
06/30/2023 COT - RSEL - Electrical Underground Passed
08/21/2023 COT - RSBU - Roof Nailing Passed
08/22/2023 COT - RSBU - Exterior Clips/Sheathing Passed
09/20/2023 BULD - Electrical Clearance Passed TEP ECO
11/06/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with insulation and sheet rock of exterior and interior walls.
11/06/2023 COT - RSPL - Gas Pressure Test Passed Gas line is properly installed and under an air pressure test that is holding 12# of compressed air. Okay to install gas meter when ready.
11/06/2023 COT - BULD - SWG Clearance Passed Gas line is properly installed and under an air pressure test that is holding 12# of compressed air. Okay to install gas meter when ready.
11/21/2023 COT - RSBU - Interior Shear Bracing Passed
11/28/2023 COT - RSBU - Firewall/Fire Barrier/Firestop Passed
01/25/2024 RSBU - Building Progress Passed
01/29/2024 COT - RSEL - Electrical Final Passed
01/29/2024 COT - RSEL - Outdoor Lighting Passed
01/29/2024 COT - RSME - Mechanical Final Passed
01/29/2024 COT - RSPL - Plumbing Final Passed
01/29/2024 RSBU - Building Final Passed
01/29/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
PT REPORT LOT 10-2023-09-20_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CBT 10 PP FOR PERMIT_V1.PDF DOCUMENTS VIEW
CBT 10 PT CERT-2023-05-23_V1.PDF DOCUMENTS VIEW