Permit: TC-MDP-0423-00865
Permit Details
Apply Date:
05/23/2023
Applicant:
Mark Alteri
Description:
PVCS1500 T22-M0040 SFR
Permit Reviews
Permit Number - TC-MDP-0423-00865
Permit Status: Complete
Permit Description: PVCS1500 T22-M0040 SFR
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/21/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/21/2023 | APPROVED |
05/24/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 06/09/2023 | APPROVED |
Conditions
Permit Number - TC-MDP-0423-00865
Permit Status: Complete
Permit Description: PVCS1500 T22-M0040 SFR
Date | Description | Comments |
---|---|---|
05/24/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
09/21/2023 | Post-Tension Inspection Report is required. | |
09/21/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
06/09/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0423-00865
Permite Description: PVCS1500 T22-M0040 SFR
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/21/2023 | COT - RSBU - Exterior Clips/Sheathing | N/A | Re-inspection required | Not ready. Missing blocking at exterior soffit. Missing rsp clips at north end of garage. Shear wall at west end of bedroom Not per length. 8/21/2023 |
11/21/2023 | COT - RSBU - Firewall/Fire Barrier/Firestop | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0423-00865
Permit Description: PVCS1500 T22-M0040 SFR
Total Completed Inspections - 23
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/26/2023 | COT - RSPL - Sewer | Passed | ||
06/26/2023 | COT - RSPL - Yard Water Line | Passed | ||
06/26/2023 | COT - RSPL - Rough Soil | Passed | ||
06/26/2023 | COT - RSPL - Backwater Valve | Passed | ||
06/30/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
06/30/2023 | COT - RSBU - Preslab | Passed | ||
06/30/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
06/30/2023 | COT - RSEL - Electrical Underground | Passed | ||
08/21/2023 | COT - RSBU - Roof Nailing | Passed | ||
08/22/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
09/20/2023 | BULD - Electrical Clearance | Passed | TEP ECO | |
11/06/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with insulation and sheet rock of exterior and interior walls. | |
11/06/2023 | COT - RSPL - Gas Pressure Test | Passed | Gas line is properly installed and under an air pressure test that is holding 12# of compressed air. Okay to install gas meter when ready. | |
11/06/2023 | COT - BULD - SWG Clearance | Passed | Gas line is properly installed and under an air pressure test that is holding 12# of compressed air. Okay to install gas meter when ready. | |
11/21/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
11/28/2023 | COT - RSBU - Firewall/Fire Barrier/Firestop | Passed | ||
01/25/2024 | RSBU - Building Progress | Passed | ||
01/29/2024 | COT - RSEL - Electrical Final | Passed | ||
01/29/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
01/29/2024 | COT - RSME - Mechanical Final | Passed | ||
01/29/2024 | COT - RSPL - Plumbing Final | Passed | ||
01/29/2024 | RSBU - Building Final | Passed | ||
01/29/2024 | ENGR Engineering Final | Passed |