Permit: TC-MDP-0423-00861
Permit Details
Apply Date:
09/08/2023
Applicant:
Stephanie Bebee
Description:
SFR CVPLAN2.5 T22-M0062
Permit Reviews
Permit Number - TC-MDP-0423-00861
Permit Status: Complete
Permit Description: SFR CVPLAN2.5 T22-M0062
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
11/17/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/17/2023 | APPROVED |
09/08/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 09/15/2023 | APPROVED |
Conditions
Permit Number - TC-MDP-0423-00861
Permit Status: Complete
Permit Description: SFR CVPLAN2.5 T22-M0062
Date | Description | Comments |
---|---|---|
09/08/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
09/11/2023 | Post-Tension Inspection Report is required. | |
09/08/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0423-00861
Permit Description: SFR CVPLAN2.5 T22-M0062
Total Completed Inspections - 22
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/03/2023 | COT - RSPL - Sewer | Passed | ||
10/03/2023 | COT - RSPL - Rough Soil | Passed | 10/3/23: plumbing per plan ok to backfill. Shading is required | |
10/03/2023 | COT - RSPL - Backwater Valve | Passed | ||
10/03/2023 | COT - RSPL - Yard Water Line | Passed | ||
10/12/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
10/12/2023 | COT - RSEL - Electrical Underground | Passed | ||
10/12/2023 | COT - RSBU - Preslab | Passed | ||
10/12/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
11/13/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | Exterior shear wall sheathing is properly nailed off, anchor bolts are installed in load bearing walls with proper plate washers. Okay to proceed with rough-in of other trades and stucco installation. | |
11/13/2023 | COT - RSBU - Roof Nailing | Passed | Roof sheathing is properly nailed off, H2.5 clips are attached to all exterior wall rafters, TJI joists hangers are properly attached to ledger board and nailed off. Okay to proceed with drying in of roof. | |
12/11/2023 | BULD - Electrical Clearance | Passed | TEP ECO | |
01/16/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
01/16/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
02/09/2024 | COT - RSBU - Interior Shear Bracing | Passed | 2/9/24: Interior shear walls are properly installed and screwed off per plans. Okay to proceed with tape and texture. | |
04/10/2024 | COT - BULD - SWG Clearance | Passed | SWG for meter only | |
04/30/2024 | COT - RSEL - Electrical Final | Passed | ||
04/30/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
04/30/2024 | COT - RSME - Mechanical Final | Passed | ||
04/30/2024 | RSBU - Building Progress | Passed | ||
05/01/2024 | COT - RSPL - Plumbing Final | Passed | 5/1/24: PVC pipes coming through roof have been painted to protect them from the sun. All other work is complete and operational. Okay to issue Certificate of Occupancy when Fire & Engineering sign off on permit. | |
05/01/2024 | RSBU - Building Final | Passed | 5/1/24: PVC pipes coming through roof have been painted to protect them from the sun. All other work is complete and operational. Okay to issue Certificate of Occupancy when Fire & Engineering sign off on permit. | |
05/01/2024 | ENGR Engineering Final | Passed | All looks good |