Permit: TC-MDP-0423-00860
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
1837 S TEACHERS ROW LN
Address NEW:
1837 S TEACHERS ROW LN
Apply Date:
05/25/2023
Applicant:
Mark Alteri
Description:
SFR CVPLAN2.5 T22-M0062
Permit Reviews
Permit Number - TC-MDP-0423-00860
Permit Status: Complete
Permit Description: SFR CVPLAN2.5 T22-M0062
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/16/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/17/2023 | APPROVED |
| 05/26/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 06/09/2023 | APPROVED |
Conditions
Permit Number - TC-MDP-0423-00860
Permit Status: Complete
Permit Description: SFR CVPLAN2.5 T22-M0062
| Date | Description | Comments |
|---|---|---|
| 05/26/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 10/17/2023 | Post-Tension Inspection Report is required. | |
| 05/26/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 06/09/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0423-00860
Permite Description: SFR CVPLAN2.5 T22-M0062
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/31/2024 | RSBU - Building Progress | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0423-00860
Permit Description: SFR CVPLAN2.5 T22-M0062
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/21/2023 | COT - RSPL - Backwater Valve | Passed | ||
| 06/21/2023 | COT - RSPL - Rough Soil | Passed | ||
| 06/21/2023 | COT - RSPL - Sewer | Passed | ||
| 06/21/2023 | COT - RSPL - Yard Water Line | Passed | ||
| 06/27/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 06/27/2023 | COT - RSBU - Preslab | Passed | ||
| 06/27/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
| 08/14/2023 | COT - RSBU - Roof Nailing | Passed | Roof is properly nailed off. | |
| 08/14/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Shear walls are properly bolted to concrete slab. All plywood is properly nailed off. | |
| 09/20/2023 | BULD - Electrical Clearance | Passed | TEP ECO | |
| 11/06/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with insulation and sheet rock of exterior and interior walls. | |
| 11/06/2023 | COT - RSPL - Gas Pressure Test | Passed | Gas line is under 14# compressed air pressure test and holding. Okay to install gas meter when ready. | |
| 11/06/2023 | COT - BULD - SWG Clearance | Passed | Gas line is under 14# compressed air pressure test and holding. Okay to install gas meter when ready. | |
| 11/29/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 01/31/2024 | RSBU - Building Final | Passed | ||
| 01/31/2024 | COT - RSPL - Plumbing Final | Passed | ||
| 01/31/2024 | COT - RSME - Mechanical Final | Passed | ||
| 01/31/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
| 01/31/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 01/31/2024 | COT - RSEL - Electrical Final | Passed | ||
| 02/01/2024 | ENGR Engineering Final | Passed |