Permit: TC-MDP-0423-00859
Permit Details
Status:
Inspections
Type:
Model Building Permit
Address:
12737 E TORTOISE POINTE DR
Address NEW:
12737 E TORTOISE POINTE DR
Apply Date:
08/22/2023
Applicant:
Amy Stokes, Operations Accountant
Description:
SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2 Structural calcs and Post grade,
Permit Reviews
Permit Number - TC-MDP-0423-00859
Permit Status: Inspections
Permit Description: SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2
Structural calcs and Post grade,
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/29/2024 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 02/01/2024 | APPROVED |
| 09/12/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 09/22/2023 | APPROVED |
| 08/22/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 08/23/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0423-00859
Permit Status: Inspections
Permit Description: SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2
Structural calcs and Post grade,
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 08/22/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 08/22/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 08/22/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 08/22/2023 | Post-Tension Inspection Report is required. |
| 08/22/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
| 08/22/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-0423-00859
Permit Status: Inspections
Permit Description: SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2
Structural calcs and Post grade,
| Date | Description | Comments |
|---|---|---|
| 09/28/2023 | The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account. | |
| 08/22/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0423-00859
Permite Description: SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2
Structural calcs and Post grade,
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/13/2024 | ENGR Engineering Final | N/A | Partial Pass | The site was inspected and found to be partially passable at this time. There is approximately 8 to 10 feet of common area sidewalk missing at the south east corner of this property. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0423-00859
Permit Description: SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2
Structural calcs and Post grade,
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/30/2024 | COT - RSPL - Rough Soil | Passed | ||
| 04/30/2024 | COT - RSPL - Sewer | Passed | ||
| 04/30/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 05/10/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, post tension cabling is installed, underground electrical is in place, Ufer ground is in place on left side of garage, required shear wall hold downs are in place and connected to rebar reinforcement, masa clips are evenly spaced around outside edge of form, and all underground plumbing pipes are wrapped with foam and all bathtub or shower stall drain lines are blocked out properly. Okay to pour concrete for footings and slab on grade. | |
| 05/10/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, post tension cabling is installed, underground electrical is in place, Ufer ground is in place on left side of garage, required shear wall hold downs are in place and connected to rebar reinforcement, masa clips are evenly spaced around outside edge of form, and all underground plumbing pipes are wrapped with foam and all bathtub or shower stall drain lines are blocked out properly. Okay to pour concrete for footings and slab on grade. | |
| 05/10/2024 | COT - RSEL - Electrical Underground | Passed | Concrete forms are set, post tension cabling is installed, underground electrical is in place, Ufer ground is in place on left side of garage, required shear wall hold downs are in place and connected to rebar reinforcement, masa clips are evenly spaced around outside edge of form, and all underground plumbing pipes are wrapped with foam and all bathtub or shower stall drain lines are blocked out properly. Okay to pour concrete for footings and slab on grade. | |
| 05/10/2024 | COT - RSEL - Grounding/Bonding | Passed | Concrete forms are set, post tension cabling is installed, underground electrical is in place, Ufer ground is in place on left side of garage, required shear wall hold downs are in place and connected to rebar reinforcement, masa clips are evenly spaced around outside edge of form, and all underground plumbing pipes are wrapped with foam and all bathtub or shower stall drain lines are blocked out properly. Okay to pour concrete for footings and slab on grade. | |
| 06/05/2024 | COT - RSBU - Roof Nailing | Passed | Roof trusses and sheathing is properly nailed off, trusses are secured to top plate with H2.5 hurricane clips. Okay to proceed with top out of plumbing. | |
| 06/05/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | All bottom plates are secured to concrete floor with shot pins, bolts, or a/b bolts. Shear wall hold downs are in place and properly nailed. All large headers have been properly strapped and nailed. All plywood sheathing is nailed off per plans and code. Okay to proceed. | |
| 06/25/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 06/25/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
| 07/05/2024 | COT - RSBU - Interior Shear Bracing | Passed | Drywall is properly screwed on all shear walls per plan requirements. | |
| 07/05/2024 | BULD - Electrical Clearance | Passed | 7/5/24: Temporary breakers and receptacle is installed. Okay issue TEP ECO Clearance. | |
| 08/20/2024 | COT - BULD - SWG Clearance | Passed | Clearance for Southwest Gas. 8/20/2024 | |
| 09/13/2024 | COT - RSEL - Electrical Final | Passed | Construction is complete. Okay to issue Certificate of Occupancy. | |
| 09/13/2024 | COT - RSEL - Outdoor Lighting | Passed | Construction is complete. Okay to issue Certificate of Occupancy. | |
| 09/13/2024 | COT - RSME - Mechanical Final | Passed | Construction is complete. Okay to issue Certificate of Occupancy. | |
| 09/13/2024 | COT - RSPL - Plumbing Final | Passed | Construction is complete. Okay to issue Certificate of Occupancy. | |
| 09/13/2024 | RSBU - Building Final | Passed | Construction is complete. Okay to issue Certificate of Occupancy. | |
| 09/13/2024 | RSBU - Building Progress | Passed | Construction is complete. Okay to issue Certificate of Occupancy. |