Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
05/10/2023
Applicant:
Amy Stokes, Operations Accountant
Description:
SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2 Structural calcs and Post grade,

Permit Reviews

Permit Number - TC-MDP-0423-00855
Permit Status: Complete
Permit Description: SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2 Structural calcs and Post grade,
Start Date Submittal Complete Date Status  
05/12/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 05/16/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0423-00855
Permit Status: Complete
Permit Description: SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2 Structural calcs and Post grade,
Total Outstanding Activity Conditions - 6
Date Name
05/12/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
05/12/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
05/12/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
05/12/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
05/15/2023 Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents.
05/15/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0423-00855
Permit Status: Complete
Permit Description: SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2 Structural calcs and Post grade,
Date Description Comments
05/12/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0423-00855
Permite Description: SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2 Structural calcs and Post grade,
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
06/02/2023 COT - RSPL - Rough Soil N/A Partial Pass 6-2-23: All is good, except a backwater valve is needed per IRC P3008.1. OK to proceed elsewhere..
06/02/2023 COT - RSPL - Sewer N/A Partial Pass

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0423-00855
Permit Description: SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2 Structural calcs and Post grade,
Total Completed Inspections - 22
Date Description Inspector Results Comments
06/06/2023 COT - RSPL - Rough Soil Passed
06/06/2023 COT - RSPL - Sewer Passed
06/20/2023 COT - RSBU - Excavation/Rebar/Zoning Passed passed
06/20/2023 COT - RSBU - Preslab Passed
06/20/2023 COT - RSEL - Electrical Underground Passed passed
06/20/2023 COT - RSEL - Grounding/Bonding Passed passed
07/13/2023 COT - RSBU - Roof Nailing Passed
08/17/2023 COT - RSPL - Gas Pressure Test Passed
08/17/2023 COT - RSPL - Yard Water Line Passed
08/21/2023 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
08/21/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
09/05/2023 COT - RSBU - Interior Shear Bracing Passed 9/5/23: passed
09/15/2023 BULD - Electrical Clearance Passed 9/15/23 ECO ok to Energize to TEP, address label on upside down.
10/25/2023 COT - BULD - SWG Clearance Passed Swg clearance for meter only.
10/25/2023 COT - RSPL - Backwater Valve Passed
11/14/2023 COT - RSEL - Electrical Final Passed
11/14/2023 COT - RSEL - Outdoor Lighting Passed
11/14/2023 COT - RSME - Mechanical Final Passed
11/14/2023 COT - RSPL - Plumbing Final Passed
11/14/2023 RSBU - Building Final Passed
11/14/2023 RSBU - Building Progress Passed
11/14/2023 ENGR Engineering Final Passed Complete the work along the east side of the property between the wall and the back of the curb

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_SITEPLAN_REVISION_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2023-05-10_V1.PDF DOCUMENTS VIEW