Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0423-00836
Permit Details
Apply Date:
05/03/2023
Applicant:
John Hodge
Description:
PULT3519-3 T21-M0048 SFR
Permit Reviews
Permit Number - TC-MDP-0423-00836
Permit Status: Issued
Permit Description: PULT3519-3 T21-M0048 SFR
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/04/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 05/05/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0423-00836
Permit Status: Issued
Permit Description: PULT3519-3 T21-M0048 SFR
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
05/04/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
05/04/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
05/04/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
05/05/2023 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. |
05/05/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-0423-00836
Permit Status: Issued
Permit Description: PULT3519-3 T21-M0048 SFR
Date | Description | Comments |
---|---|---|
05/04/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-MDP-0423-00836
Permite Description: PULT3519-3 T21-M0048 SFR
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/25/2023 | BULD - Electrical Clearance | N/A | Re-inspection required | Missing address label. |
12/04/2023 | ENGR Engineering Final | N/A | Not Ready | 1) flush sewer clean out with driveway and install traffic rated cap. 2) side walk to right does not go,to property line and dirt is encroached into yard. Note only, curb at driveway is broken up. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0423-00836
Permit Description: PULT3519-3 T21-M0048 SFR
Total Completed Inspections - 20
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/07/2023 | COT - RSPL - Yard Water Line | Passed | ||
07/07/2023 | COT - RSPL - Sewer | Passed | ||
07/07/2023 | COT - RSPL - Rough Soil | Passed | ||
07/12/2023 | COT - RSEL - Electrical Underground | Passed | ||
07/13/2023 | COT - RSBU - Preslab | Passed | ||
07/13/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
08/02/2023 | COT - RSBU - Roof Nailing | Passed | ||
08/03/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
09/01/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
09/01/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
09/01/2023 | RSBU - Building Progress | Passed | ||
09/05/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 9/1/23: refrigerant lines not made up to furnace in attic, missing blocking on register in pantry 9/5/23: all corrections made. Ok to insulate |
|
09/20/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
10/31/2023 | BULD - Electrical Clearance | Passed | ||
11/15/2023 | COT - BULD - SWG Clearance | Passed | Meter only. | |
12/04/2023 | COT - RSEL - Electrical Final | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled. | |
12/04/2023 | COT - RSEL - Outdoor Lighting | Passed | Outdoor lighting is installed per plans. | |
12/04/2023 | COT - RSPL - Plumbing Final | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled. | |
12/04/2023 | COT - RSME - Mechanical Final | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled. | |
12/04/2023 | RSBU - Building Final | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled. |