Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
05/03/2023
Applicant:
John Hodge
Description:
PULT3519-3 T21-M0048 SFR

Permit Reviews

Permit Number - TC-MDP-0423-00836
Permit Status: Issued
Permit Description: PULT3519-3 T21-M0048 SFR
Start Date Submittal Complete Date Status  
05/04/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 05/05/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0423-00836
Permit Status: Issued
Permit Description: PULT3519-3 T21-M0048 SFR
Total Outstanding Activity Conditions - 5
Date Name
05/04/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
05/04/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
05/04/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
05/05/2023 Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents.
05/05/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0423-00836
Permit Status: Issued
Permit Description: PULT3519-3 T21-M0048 SFR
Date Description Comments
05/04/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-MDP-0423-00836
Permite Description: PULT3519-3 T21-M0048 SFR
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
10/25/2023 BULD - Electrical Clearance N/A Re-inspection required Missing address label.
12/04/2023 ENGR Engineering Final N/A Not Ready 1) flush sewer clean out with driveway and install traffic rated cap.
2) side walk to right does not go,to property line and dirt is encroached into yard.

Note only, curb at driveway is broken up.

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0423-00836
Permit Description: PULT3519-3 T21-M0048 SFR
Total Completed Inspections - 20
Date Description Inspector Results Comments
07/07/2023 COT - RSPL - Yard Water Line Passed
07/07/2023 COT - RSPL - Sewer Passed
07/07/2023 COT - RSPL - Rough Soil Passed
07/12/2023 COT - RSEL - Electrical Underground Passed
07/13/2023 COT - RSBU - Preslab Passed
07/13/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
08/02/2023 COT - RSBU - Roof Nailing Passed
08/03/2023 COT - RSBU - Exterior Clips/Sheathing Passed
09/01/2023 COT - RSEL - Grounding/Bonding Passed
09/01/2023 COT - RSPL - Gas Pressure Test Passed
09/01/2023 RSBU - Building Progress Passed
09/05/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 9/1/23: refrigerant lines not made up to furnace in attic, missing blocking on register in pantry
9/5/23: all corrections made. Ok to insulate
09/20/2023 COT - RSBU - Interior Shear Bracing Passed
10/31/2023 BULD - Electrical Clearance Passed
11/15/2023 COT - BULD - SWG Clearance Passed Meter only.
12/04/2023 COT - RSEL - Electrical Final Passed Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled.
12/04/2023 COT - RSEL - Outdoor Lighting Passed Outdoor lighting is installed per plans.
12/04/2023 COT - RSPL - Plumbing Final Passed Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled.
12/04/2023 COT - RSME - Mechanical Final Passed Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled.
12/04/2023 RSBU - Building Final Passed Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
7585 - LE LOT 01204 - SIC-2023-05-03_V1.PDF DOCUMENTS VIEW
LE 01204_V1.PDF DOCUMENTS VIEW