Permit: TC-MDP-0325-00205
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
9535 E MEOLA DR
Address NEW:
9535 E MEOLA DR
Apply Date:
06/17/2025
Applicant:
Celina Rodriguez
Description:
Mirador Point 1201 Plan (Model master plan TC-MDP-0125-00062)
Permit Reviews
Permit Number - TC-MDP-0325-00205
Permit Status: Inspections complete
Permit Description: Mirador Point 1201 Plan (Model master plan TC-MDP-0125-00062)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/20/2025 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 06/27/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0325-00205
Permit Status: Inspections complete
Permit Description: Mirador Point 1201 Plan (Model master plan TC-MDP-0125-00062)
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 03/25/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
| 06/23/2025 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 06/23/2025 | Post-Installed Anchor Inspection Report is required. |
| 06/23/2025 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. |
| 06/23/2025 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0325-00205
Permit Status: Inspections complete
Permit Description: Mirador Point 1201 Plan (Model master plan TC-MDP-0125-00062)
| Date | Description | Comments |
|---|---|---|
| 03/25/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0325-00205
Permite Description: Mirador Point 1201 Plan (Model master plan TC-MDP-0125-00062)
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/21/2025 | COT - RSEL - Electrical Underground | N/A | Not Applicable | no underground electric |
| 10/21/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | |
| 10/21/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0325-00205
Permit Description: Mirador Point 1201 Plan (Model master plan TC-MDP-0125-00062)
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/15/2025 | COT - RSPL - Rough Soil | Passed | Passed 7/5/25 ok to backfill | |
| 07/15/2025 | COT - RSPL - Sewer | Passed | Passed 7/5/25 ok to backfill | |
| 07/15/2025 | COT - RSPL - Yard Water Line | Passed | Passed 7/5/25 ok to backfill | |
| 07/21/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Passed 7/21/25 ok to pour concrete | |
| 07/21/2025 | COT - RSBU - Preslab | Passed | Passed 7/21/25 ok to pour concrete | |
| 07/28/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 07/28/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 08/13/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 08/13/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 08/14/2025 | BULD - Electrical Clearance | Passed | Ready for temp power clearance ECO | |
| 08/22/2025 | COT - RSBU - Interior Shear Bracing | Passed | 8.22.25 Fastener schedule verified APPROVED |
|
| 10/21/2025 | RSBU - Building Progress | Passed | ||
| 10/21/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 10/21/2025 | ENGR Engineering Final | Passed | ||
| 10/21/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 10/21/2025 | COT - RSEL - Electrical Final | Passed | ||
| 10/22/2025 | COT - RSME - Mechanical Final | Passed | 10.22.225 Correction made to yesterday's inspection. |
|
| 10/22/2025 | RSBU - Building Final | Passed | 10.22.225 Correction made to yesterday's inspection. |