Permit: TC-MDP-0325-00181
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
9514 E WYNALDA DR
Address NEW:
9514 E WYNALDA DR
Apply Date:
03/11/2025
Applicant:
Celina Rodriguez
Description:
Mirador Point 2037 Plan (Model master plan TC-MDP-0125-00063)
Permit Reviews
Permit Number - TC-MDP-0325-00181
Permit Status: Inspections complete
Permit Description: Mirador Point 2037 Plan (Model master plan TC-MDP-0125-00063)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/15/2025 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 04/22/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0325-00181
Permit Status: Inspections complete
Permit Description: Mirador Point 2037 Plan (Model master plan TC-MDP-0125-00063)
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 03/18/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
Conditions
Permit Number - TC-MDP-0325-00181
Permit Status: Inspections complete
Permit Description: Mirador Point 2037 Plan (Model master plan TC-MDP-0125-00063)
| Date | Description | Comments |
|---|---|---|
| 04/15/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 03/18/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0325-00181
Permite Description: Mirador Point 2037 Plan (Model master plan TC-MDP-0125-00063)
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/29/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 04/29/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | |
| 05/07/2025 | COT - RSEL - Grounding/Bonding | N/A | Partial Pass | Partial pass for ufer, will check connection at later date |
| 04/29/2025 | COT - RSPL - Yard Water Line | N/A | Re-inspection required | 4/29/25: Pex line not under pressure |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0325-00181
Permit Description: Mirador Point 2037 Plan (Model master plan TC-MDP-0125-00063)
Total Completed Inspections - 19
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/29/2025 | COT - RSPL - Sewer | Passed | 4/29/25: PLUMBING PER APPROVED PLANS OK TO BACKFILL. SHADING REQUIRED | |
| 04/29/2025 | COT - RSPL - Rough Soil | Passed | 4/29/25: PLUMBING PER APPROVED PLANS OK TO BACKFILL. SHADING REQUIRED | |
| 05/07/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Passed 5/7/25 ok to pour concrete | |
| 05/07/2025 | COT - RSBU - Preslab | Passed | Passed 5/7/25 ok to pour concrete | |
| 05/07/2025 | COT - RSEL - Electrical Underground | Passed | Passed 5/7/25 ok to pour concrete | |
| 05/15/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 05/15/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 06/09/2025 | COT - RSEL - Grounding/Bonding | Passed | Ready for temp power clearance ECO | |
| 06/09/2025 | COT - RSPL - Yard Water Line | Passed | 6/9/25 passed | |
| 06/09/2025 | BULD - Electrical Clearance | Passed | Ready for temp power clearance ECO | |
| 06/11/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 6/11/25 corrections made | |
| 06/17/2025 | COT - RSBU - Interior Shear Bracing | Passed | 6.17.25 approved per plans | |
| 08/05/2025 | COT - RSEL - Outdoor Lighting | Passed | 8.5.25 Corrections verified by photo APPROVED |
|
| 08/05/2025 | COT - RSEL - Electrical Final | Passed | 8.5.25 Corrections verified by photo APPROVED |
|
| 08/05/2025 | COT - RSME - Mechanical Final | Passed | 8.5.25 Corrections verified by photo APPROVED |
|
| 08/05/2025 | COT - RSPL - Plumbing Final | Passed | 8.5.25 Corrections verified by photo APPROVED |
|
| 08/05/2025 | ENGR Engineering Final | Passed | ||
| 08/05/2025 | RSBU - Building Final | Passed | 8.5.25 Corrections verified by photo APPROVED |
|
| 08/05/2025 | RSBU - Building Progress | Passed | 8.5.25 Corrections verified by photo APPROVED |