Permit: TC-MDP-0325-00174
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
4491 S TREAT AV
Address NEW:
4491 S TREAT AV
Apply Date:
05/19/2025
Applicant:
David Evans
Description:
Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
Permit Reviews
Permit Number - TC-MDP-0325-00174
Permit Status: Inspections complete
Permit Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/31/2025 | ADMINISTRATIVE v.1 | 12/31/2025 | REQUIRES RESUBMIT |
| 05/21/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 06/12/2025 | REQUIRES RESUBMIT |
| 12/31/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/02/2026 | APPROVED |
| 01/02/2026 | ADMINISTRATIVE v.2 | 01/02/2026 | APPROVED |
| 06/27/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 | 07/18/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0325-00174
Permit Status: Inspections complete
Permit Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
| Date | Description | Comments |
|---|---|---|
| 03/06/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 03/06/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 06/11/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0325-00174
Permite Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/28/2026 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 04/28/2026 | COT - RSEL - Electrical Underground | N/A | Not Applicable | |
| 04/28/2026 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0325-00174
Permit Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/07/2026 | COT - RSPL - Rough Soil | Passed | 01/07/2026 All fixtures present and holding under test in clean trench and slope. Okay to backfill, shading materials required. |
|
| 01/07/2026 | COT - RSPL - Sewer | Passed | 01/07/2026 ABS holding under test with green tracer wire to HCS. Okay to backfill, shading materials required. |
|
| 01/16/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 01/16/2026 Approved per plan. Okay for concrete placement. |
|
| 01/16/2026 | COT - RSBU - Preslab | Passed | 01/16/2026 Approved per plan. Okay for concrete placement. |
|
| 02/23/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Passed 2/23/26 | |
| 02/23/2026 | COT - RSBU - Roof Nailing | Passed | Passed 2/23/26 | |
| 02/23/2026 | COT - RSBU - Interior Shear Bracing | Passed | Passed 2/23/26 | |
| 02/25/2026 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. UNIT #1 & #2. 2/25/2026 | |
| 02/25/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 02/25/2026 | COT - RSEL - Grounding/Bonding | Passed | ||
| 04/28/2026 | COT - RSEL - Electrical Final | Passed | ||
| 04/28/2026 | COT - RSEL - Outdoor Lighting | Passed | ||
| 04/28/2026 | COT - RSME - Mechanical Final | Passed | ||
| 04/28/2026 | COT - RSPL - Plumbing Final | Passed | ||
| 04/28/2026 | COT - RSPL - Yard Water Line | Passed | ||
| 04/28/2026 | ENGR Engineering Final | Passed | Site is complete in accordance with approved plans. | |
| 04/28/2026 | RSBU - Building Final | Passed | ||
| 04/28/2026 | RSBU - Building Progress | Passed |