Permit: TC-MDP-0324-00361
Permit Details
Apply Date:
04/17/2024
Applicant:
Celina Rodriguez
Description:
SFR BT2013-140 T22-M0036
Permit Reviews
Permit Number - TC-MDP-0324-00361
Permit Status: Inspections complete
Permit Description: SFR BT2013-140 T22-M0036
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/18/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 04/24/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0324-00361
Permit Status: Inspections complete
Permit Description: SFR BT2013-140 T22-M0036
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
03/28/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
04/19/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
04/19/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
04/19/2024 | Post-Tension Inspection Report is required. |
04/19/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-0324-00361
Permit Status: Inspections complete
Permit Description: SFR BT2013-140 T22-M0036
Date | Description | Comments |
---|---|---|
03/28/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0324-00361
Permite Description: SFR BT2013-140 T22-M0036
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/27/2024 | RSBU - Building Progress | N/A | Not Applicable |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0324-00361
Permit Description: SFR BT2013-140 T22-M0036
Total Completed Inspections - 20
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/30/2024 | COT - RSPL - Rough Soil | Passed | ||
04/30/2024 | COT - RSPL - Sewer | Passed | ||
04/30/2024 | COT - RSPL - Yard Water Line | Passed | ||
05/10/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, post tension cabling is installed, underground electrical is in place, Ufer ground is in place on left side of garage, required shear wall hold downs are in place and connected to rebar reinforcement, masa clips are evenly spaced around outside edge of form, and all underground plumbing pipes are wrapped with foam and all bathtub or shower stall drain lines are blocked out properly. Okay to pour concrete for footings and slab on grade. | |
05/10/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, post tension cabling is installed, underground electrical is in place, Ufer ground is in place on left side of garage, required shear wall hold downs are in place and connected to rebar reinforcement, masa clips are evenly spaced around outside edge of form, and all underground plumbing pipes are wrapped with foam and all bathtub or shower stall drain lines are blocked out properly. Okay to pour concrete for footings and slab on grade. | |
05/10/2024 | COT - RSEL - Electrical Underground | Passed | Concrete forms are set, post tension cabling is installed, underground electrical is in place, Ufer ground is in place on left side of garage, required shear wall hold downs are in place and connected to rebar reinforcement, masa clips are evenly spaced around outside edge of form, and all underground plumbing pipes are wrapped with foam and all bathtub or shower stall drain lines are blocked out properly. Okay to pour concrete for footings and slab on grade. | |
05/10/2024 | COT - RSEL - Grounding/Bonding | Passed | Concrete forms are set, post tension cabling is installed, underground electrical is in place, Ufer ground is in place on left side of garage, required shear wall hold downs are in place and connected to rebar reinforcement, masa clips are evenly spaced around outside edge of form, and all underground plumbing pipes are wrapped with foam and all bathtub or shower stall drain lines are blocked out properly. Okay to pour concrete for footings and slab on grade. | |
05/29/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
05/29/2024 | COT - RSBU - Roof Nailing | Passed | ||
06/25/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
06/26/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 6/26/24: DWV is full of water, pex lines are under street pressure, address is correct on front of house. Mechanical, electrical, and plumbing rough-in are complete. Okay to proceed with installation of insulation and drywall. | |
07/12/2024 | COT - RSBU - Interior Shear Bracing | Passed | Drywall is properly installed and secured to studs per plan for the interior shear wall detail. | |
08/01/2024 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 8/1/2024 | |
08/28/2024 | COT - BULD - SWG Clearance | Passed | Gas valves are installed on all gas lines that supply gas appliances. SWG Clearance issued to Southwest Gas Company for installation of gas meter and gas turn on. | |
09/26/2024 | COT - RSEL - Electrical Final | Passed | Passed Clearance DGC 9/26/24 | |
09/26/2024 | COT - RSEL - Outdoor Lighting | Passed | PASSED 9/26/24 | |
09/27/2024 | COT - RSME - Mechanical Final | Passed | ||
09/27/2024 | COT - RSPL - Plumbing Final | Passed | ||
09/27/2024 | RSBU - Building Final | Passed | ||
10/02/2024 | ENGR Engineering Final | Passed | CO Ready |