Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
04/17/2024
Applicant:
Celina Rodriguez
Description:
SFR BT2013-140 T22-M0036

Permit Reviews

Permit Number - TC-MDP-0324-00361
Permit Status: Inspections complete
Permit Description: SFR BT2013-140 T22-M0036
Start Date Submittal Complete Date Status  
04/18/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 04/24/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0324-00361
Permit Status: Inspections complete
Permit Description: SFR BT2013-140 T22-M0036
Total Outstanding Activity Conditions - 5
Date Name
03/28/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
04/19/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/19/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/19/2024 Post-Tension Inspection Report is required.
04/19/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0324-00361
Permit Status: Inspections complete
Permit Description: SFR BT2013-140 T22-M0036
Date Description Comments
03/28/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0324-00361
Permite Description: SFR BT2013-140 T22-M0036
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
09/27/2024 RSBU - Building Progress N/A Not Applicable

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0324-00361
Permit Description: SFR BT2013-140 T22-M0036
Total Completed Inspections - 20
Date Description Inspector Results Comments
04/30/2024 COT - RSPL - Rough Soil Passed
04/30/2024 COT - RSPL - Sewer Passed
04/30/2024 COT - RSPL - Yard Water Line Passed
05/10/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Concrete forms are set, post tension cabling is installed, underground electrical is in place, Ufer ground is in place on left side of garage, required shear wall hold downs are in place and connected to rebar reinforcement, masa clips are evenly spaced around outside edge of form, and all underground plumbing pipes are wrapped with foam and all bathtub or shower stall drain lines are blocked out properly. Okay to pour concrete for footings and slab on grade.
05/10/2024 COT - RSBU - Preslab Passed Concrete forms are set, post tension cabling is installed, underground electrical is in place, Ufer ground is in place on left side of garage, required shear wall hold downs are in place and connected to rebar reinforcement, masa clips are evenly spaced around outside edge of form, and all underground plumbing pipes are wrapped with foam and all bathtub or shower stall drain lines are blocked out properly. Okay to pour concrete for footings and slab on grade.
05/10/2024 COT - RSEL - Electrical Underground Passed Concrete forms are set, post tension cabling is installed, underground electrical is in place, Ufer ground is in place on left side of garage, required shear wall hold downs are in place and connected to rebar reinforcement, masa clips are evenly spaced around outside edge of form, and all underground plumbing pipes are wrapped with foam and all bathtub or shower stall drain lines are blocked out properly. Okay to pour concrete for footings and slab on grade.
05/10/2024 COT - RSEL - Grounding/Bonding Passed Concrete forms are set, post tension cabling is installed, underground electrical is in place, Ufer ground is in place on left side of garage, required shear wall hold downs are in place and connected to rebar reinforcement, masa clips are evenly spaced around outside edge of form, and all underground plumbing pipes are wrapped with foam and all bathtub or shower stall drain lines are blocked out properly. Okay to pour concrete for footings and slab on grade.
05/29/2024 COT - RSBU - Exterior Clips/Sheathing Passed
05/29/2024 COT - RSBU - Roof Nailing Passed
06/25/2024 COT - RSPL - Gas Pressure Test Passed
06/26/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 6/26/24: DWV is full of water, pex lines are under street pressure, address is correct on front of house. Mechanical, electrical, and plumbing rough-in are complete. Okay to proceed with installation of insulation and drywall.
07/12/2024 COT - RSBU - Interior Shear Bracing Passed Drywall is properly installed and secured to studs per plan for the interior shear wall detail.
08/01/2024 BULD - Electrical Clearance Passed Clearance for TEP ECO. 8/1/2024
08/28/2024 COT - BULD - SWG Clearance Passed Gas valves are installed on all gas lines that supply gas appliances. SWG Clearance issued to Southwest Gas Company for installation of gas meter and gas turn on.
09/26/2024 COT - RSEL - Electrical Final Passed Passed Clearance DGC 9/26/24
09/26/2024 COT - RSEL - Outdoor Lighting Passed PASSED 9/26/24
09/27/2024 COT - RSME - Mechanical Final Passed
09/27/2024 COT - RSPL - Plumbing Final Passed
09/27/2024 RSBU - Building Final Passed
10/02/2024 ENGR Engineering Final Passed CO Ready

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA PHASE 2 - LOT 20 START_V1.PDF DOCUMENTS VIEW
BTII 20 SIC-2024-04-17_V1.PDF DOCUMENTS VIEW