Permit: TC-MDP-0324-00359
Permit Details
Apply Date:
04/01/2024
Applicant:
Celina Rodriguez
Description:
SFR BT2013-140 T22-M0036
Permit Reviews
Permit Number - TC-MDP-0324-00359
Permit Status: Inspections complete
Permit Description: SFR BT2013-140 T22-M0036
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/01/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 04/05/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0324-00359
Permit Status: Inspections complete
Permit Description: SFR BT2013-140 T22-M0036
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
03/28/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
04/04/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
04/04/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
04/04/2024 | Post-Tension Inspection Report is required. |
04/04/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-0324-00359
Permit Status: Inspections complete
Permit Description: SFR BT2013-140 T22-M0036
Date | Description | Comments |
---|---|---|
03/28/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0324-00359
Permite Description: SFR BT2013-140 T22-M0036
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/27/2024 | RSBU - Building Progress | N/A | Not Applicable | |
09/27/2024 | COT - RSEL - Electrical Final | N/A | Re-inspection required | need more clamps on AC seal tight. |
09/27/2024 | COT - RSME - Mechanical Final | N/A | Re-inspection required | Provide ladder for attic access. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0324-00359
Permit Description: SFR BT2013-140 T22-M0036
Total Completed Inspections - 20
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/18/2024 | COT - RSPL - Rough Soil | Passed | ||
04/18/2024 | COT - RSPL - Yard Water Line | Passed | ||
04/18/2024 | COT - RSPL - Sewer | Passed | ||
05/01/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, post tension cabling is properly installed and supported off of ground, rebar reinforcement is installed per plans, underground plumbing is properly wrapped for protection, Ufer ground is installed, and all shear wall & masa clips are installed. Okay to pour concrete. | |
05/01/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, post tension cabling is properly installed and supported off of ground, rebar reinforcement is installed per plans, underground plumbing is properly wrapped for protection, Ufer ground is installed, and all shear wall & masa clips are installed. Okay to pour concrete. | |
05/01/2024 | COT - RSEL - Electrical Underground | Passed | Concrete forms are set, post tension cabling is properly installed and supported off of ground, rebar reinforcement is installed per plans, underground plumbing is properly wrapped for protection, Ufer ground is installed, and all shear wall & masa clips are installed. Okay to pour concrete. | |
05/01/2024 | COT - RSEL - Grounding/Bonding | Passed | Concrete forms are set, post tension cabling is properly installed and supported off of ground, rebar reinforcement is installed per plans, underground plumbing is properly wrapped for protection, Ufer ground is installed, and all shear wall & masa clips are installed. Okay to pour concrete. | |
05/13/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | Bottom plates are properly secured to concrete floor with masa clips or ab bolts. Plywood sheathing for exterior shear walls is properly nailed per plans and code. Shear wall straps are installed and properly secured with nails to wall framing. Okay to proceed. | |
05/13/2024 | COT - RSBU - Roof Nailing | Passed | Roof trusses are properly installed and secured to top plate with H2.5 clips. Plywood sheathing is properly nailed to trusses per plan and code. Okay to proceed with plumbing top out. | |
06/14/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
06/17/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 6/17/24: Mechanical, electrical, and plumbing rough-in is complete. Penetrations and rips in vapor barrier have been caulked. DWV is full of water with no leaks. Exhaust fan in main bathroom is properly wired and light fixture in hallway is properly secured to trusses. Okay to proceed with installation of insulation and drywall. | |
07/03/2024 | COT - RSBU - Interior Shear Bracing | Passed | 7/3/24: sheet rock on interior shear walls is properly screwed. Okay to proceed with tape, texture, and paint. | |
07/12/2024 | BULD - Electrical Clearance | Passed | Okay to energize. Issuing an ECO Clearance to TEP. | |
08/27/2024 | COT - BULD - SWG Clearance | Passed | SWG for meter only | |
09/27/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
09/27/2024 | COT - RSPL - Plumbing Final | Passed | ||
09/27/2024 | ENGR Engineering Final | Passed | CO ready | |
09/27/2024 | RSBU - Building Final | Passed | ||
10/02/2024 | COT - RSEL - Electrical Final | Passed | Construction is complete. Okay to issue Certificate of Occupancy. | |
10/02/2024 | COT - RSME - Mechanical Final | Passed | Construction is complete. Okay to issue Certificate of Occupancy. |