Permit: TC-MDP-0324-00344
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
6549 E PASEO ALGA
Address NEW:
6549 E PASEO ALGA
Apply Date:
03/20/2024
Applicant:
Brianna Quiroz
Description:
Roosevelt Model SFR La Estancia (Revision 1 Truss)
Permit Reviews
Permit Number - TC-MDP-0324-00344
Permit Status: Complete
Permit Description: Roosevelt Model SFR La Estancia (Revision 1 Truss)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/24/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/24/2025 | APPROVED |
| 03/20/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 03/27/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0324-00344
Permit Status: Complete
Permit Description: Roosevelt Model SFR La Estancia (Revision 1 Truss)
| Date | Description | Comments |
|---|---|---|
| 01/24/2025 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 01/24/2025 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 01/24/2025 | Post-Installed Anchor Inspection Report is required. | |
| 03/20/2024 | Post-Tension Inspection Report is required. | |
| 03/20/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 03/20/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 01/24/2025 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 03/20/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0324-00344
Permite Description: Roosevelt Model SFR La Estancia (Revision 1 Truss)
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/06/2024 | COT - RSBU - Roof Nailing | N/A | Re-inspection required | 12-6-24, see previous notes. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0324-00344
Permit Description: Roosevelt Model SFR La Estancia (Revision 1 Truss)
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/09/2024 | COT - BULD - SWG Clearance | Passed | ||
| 08/09/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
| 08/09/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 08/09/2024 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading required. 8/9/2024 | |
| 08/09/2024 | COT - RSPL - Sewer | Passed | Okay to backfill. Shading required. 8/9/2024 | |
| 08/09/2024 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading required. 8/9/2024 | |
| 08/16/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 08/16/2024 | COT - RSBU - Preslab | Passed | ||
| 08/16/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 09/25/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 11/27/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 11-25-24, residential intermediates approved. | |
| 11/25/2024 | BULD - Electrical Clearance | Passed | 11-25-24, panel okay to be energized | |
| 12/16/2024 | COT - RSBU - Interior Shear Bracing | Passed | Per plans 12/16/24 | |
| 01/30/2025 | COT - RSBU - Roof Nailing | Passed | 1/30/25. Approved letter was submitted. Pass | |
| 02/07/2025 | COT - RSEL - Electrical Final | Passed | Passed final 2/7/25 CLEARANCE ECO | |
| 02/07/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 02/07/2025 | COT - RSME - Mechanical Final | Passed | Passed final 2/7/25 | |
| 02/07/2025 | COT - RSPL - Plumbing Final | Passed | Passed final 2/7/25 | |
| 02/07/2025 | ENGR Engineering Final | Passed | ||
| 02/07/2025 | RSBU - Building Final | Passed | Passed final 2/7/25 | |
| 02/07/2025 | RSBU - Building Progress | Passed | Passed final 2/7/25 |