Permit: TC-MDP-0324-00341
Permit Details
Apply Date:
03/20/2024
Applicant:
Brianna Quiroz
Description:
Harding SFR Model La Estancia (roof vent update)
Permit Reviews
Permit Number - TC-MDP-0324-00341
Permit Status: Issued
Permit Description: Harding SFR Model La Estancia (roof vent update)
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/20/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 03/27/2024 | APPROVED |
01/24/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/24/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0324-00341
Permit Status: Issued
Permit Description: Harding SFR Model La Estancia (roof vent update)
Date | Description | Comments |
---|---|---|
01/24/2025 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
03/27/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
03/22/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
01/24/2025 | Post-Installed Anchor Inspection Report is required. | |
03/20/2024 | Post-Tension Inspection Report is required. | |
03/20/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
03/20/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
01/24/2025 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
03/22/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-MDP-0324-00341
Permite Description: Harding SFR Model La Estancia (roof vent update)
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/04/2024 | COT - RSBU - Exterior Clips/Sheathing | N/A | Re-inspection required | Secure jack studs on both ends of the home. Nail clips in between bird blocking to top plate. Add block at hip roof south end. 10/4/2024 |
10/04/2024 | COT - RSBU - Roof Nailing | N/A | Re-inspection required | Secure jack studs on both ends of the home. Nail clips in between bird blocking to top plate. Add block at hip roof south end. 10/4/2024 |
12/12/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | Panel not per schedule, should have 30 circuits per plan, currently has 20. Missing fire foam at penetration in family room and above on 2nd floor, marked for visibility. Penetrations in vapor barrier on second floor, mostly above windows, marked for visibility 12/12/24 |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0324-00341
Permit Description: Harding SFR Model La Estancia (roof vent update)
Total Completed Inspections - 13
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/09/2024 | COT - BULD - SWG Clearance | Passed | ||
08/09/2024 | COT - RSEL - Electrical Underground | Passed | ||
08/09/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
08/09/2024 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading required. 8/9/2024 | |
08/09/2024 | COT - RSPL - Sewer | Passed | Okay to backfill. Shading required. 8/9/2024 | |
08/09/2024 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading required. 8/9/2024 | |
08/16/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
08/16/2024 | COT - RSBU - Preslab | Passed | ||
08/16/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
10/09/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | Corrections were made. 10/9/2024 | |
10/09/2024 | COT - RSBU - Roof Nailing | Passed | Corrections were made. 10/9/2024 | |
11/25/2024 | BULD - Electrical Clearance | Passed | 11-25-24, panel okay to be energized | |
12/23/2024 | COT - RSBU - Interior Shear Bracing | Passed | Passed interior shear bracing 12/23/24 |