Permit Details

Status:
Complete
Type:
Model Building Permit
Address:
1833 S POETRY LN
Apply Date:
03/26/2024
Applicant:
Stephanie Bebee
Description:
PVCS1500 T22-M0040 SFR

Permit Reviews

Permit Number - TC-MDP-0324-00339
Permit Status: Complete
Permit Description: PVCS1500 T22-M0040 SFR
Start Date Submittal Complete Date Status  
07/08/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/08/2024 APPROVED Review Details
07/26/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/29/2024 APPROVED Review Details
03/28/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 04/04/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0324-00339
Permit Status: Complete
Permit Description: PVCS1500 T22-M0040 SFR
Date Description Comments
04/01/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/01/2024 Post-Tension Inspection Report is required.
03/20/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
03/20/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
04/01/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0324-00339
Permit Description: PVCS1500 T22-M0040 SFR
Total Completed Inspections - 23
Date Description Inspector Results Comments
04/23/2024 COT - RSPL - Yard Water Line Passed
04/23/2024 COT - RSPL - Sewer Passed
04/23/2024 COT - RSPL - Rough Soil Passed
04/23/2024 COT - RSPL - Backwater Valve Passed
04/29/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
04/29/2024 COT - RSBU - Preslab Passed
04/29/2024 COT - RSEL - Electrical Underground Passed
04/29/2024 COT - RSEL - Grounding/Bonding Passed
06/04/2024 COT - RSBU - Exterior Clips/Sheathing Passed
06/04/2024 COT - RSBU - Roof Nailing Passed
06/18/2024 COT - RSBU - Firewall/Fire Barrier/Firestop Passed
07/22/2024 BULD - Electrical Clearance Passed
07/26/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with installation of insulation and drywall.
07/26/2024 COT - RSPL - Gas Pressure Test Passed Gas lines are under 15 pounds of air pressure with no leaks. Okay to proceed.
08/16/2024 COT - RSBU - Interior Shear Bracing Passed
10/07/2024 COT - BULD - SWG Clearance Passed
10/15/2024 COT - RSEL - Electrical Final Passed 10/15/24 pass
10/15/2024 COT - RSEL - Outdoor Lighting Passed 10/15/24 pass
10/15/2024 COT - RSME - Mechanical Final Passed 10/15/24 pass
10/15/2024 COT - RSPL - Plumbing Final Passed 10/15/24 pass
10/15/2024 RSBU - Building Final Passed 10/15/24 pass
10/15/2024 RSBU - Building Progress Passed 10/15/24 pass
10/18/2024 ENGR Engineering Final Passed CO Ready

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
PT REPORT LOT 40 COMPLETE-2024-07-08_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CBT 40 PP FOR PERMIT _V1.PDF DOCUMENTS VIEW
CBT 40 PT CERT-2024-03-26_V1.PDF DOCUMENTS VIEW