Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Address:
1821 S POETRY LN
Apply Date:
04/11/2024
Applicant:
Mark Alteri
Description:
SFR CVPLAN3 T22-M0044

Permit Reviews

Permit Number - TC-MDP-0324-00335
Permit Status: Complete
Permit Description: SFR CVPLAN3 T22-M0044
Start Date Submittal Complete Date Status  
07/22/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/24/2024 APPROVED Review Details
04/12/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 04/18/2024 APPROVED Review Details
07/26/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/26/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0324-00335
Permit Status: Complete
Permit Description: SFR CVPLAN3 T22-M0044
Date Description Comments
04/19/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
04/15/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/15/2024 Post-Tension Inspection Report is required.
03/20/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
03/20/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
04/15/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0324-00335
Permit Description: SFR CVPLAN3 T22-M0044
Total Completed Inspections - 21
Date Description Inspector Results Comments
05/10/2024 COT - RSPL - Yard Water Line Passed
05/10/2024 COT - RSPL - Sewer Passed
05/10/2024 COT - RSPL - Rough Soil Passed
05/16/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
05/16/2024 COT - RSBU - Preslab Passed
05/16/2024 COT - RSEL - Electrical Underground Passed
07/29/2024 COT - RSBU - Exterior Clips/Sheathing Passed
07/29/2024 COT - RSBU - Roof Nailing Passed
08/29/2024 BULD - Electrical Clearance Passed
10/03/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
10/03/2024 COT - RSPL - Gas Pressure Test Passed
10/23/2024 COT - RSBU - Interior Shear Bracing Passed
12/17/2024 COT - BULD - SWG Clearance Passed 12/17/24 approval for SWG clearance.
01/22/2025 COT - RSEL - Electrical Final Passed 1-22-25, mechanical, electrical, plumbing, and building finals approved.
01/22/2025 COT - RSEL - Grounding/Bonding Passed 1-22-25, approved
01/22/2025 COT - RSEL - Outdoor Lighting Passed 1-22-25, outdoor lighting, mechanical, electrical, plumbing, and building finals approved.
01/22/2025 COT - RSME - Mechanical Final Passed 1-22-25, mechanical, electrical, plumbing, and building finals approved.
01/22/2025 COT - RSPL - Plumbing Final Passed 1-22-25, approved
01/22/2025 ENGR Engineering Final Passed CO Ready
01/22/2025 RSBU - Building Final Passed 1-22-25, mechanical, electrical, plumbing, and building finals approved.
01/22/2025 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
147632 PT LOT 38 COMPLETE-2024-07-22_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CBT 38 PP FOR PERMIT _V1.PDF DOCUMENTS VIEW
CBT 38 PT CERT-2024-04-11_V1.PDF DOCUMENTS VIEW