Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
05/01/2024
Applicant:
Stephanie Bebee
Description:
SFR CVPLAN2.5 T22-M0062 V2

Permit Reviews

Permit Number - TC-MDP-0324-00328
Permit Status: Issued
Permit Description: SFR CVPLAN2.5 T22-M0062 V2
Start Date Submittal Complete Date Status  
08/05/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/06/2024 APPROVED Review Details
07/16/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/17/2024 APPROVED Review Details
05/02/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 05/08/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0324-00328
Permit Status: Issued
Permit Description: SFR CVPLAN2.5 T22-M0062 V2
Date Description Comments
05/03/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
05/03/2024 Post-Tension Inspection Report is required.
03/20/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
03/20/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
05/03/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0324-00328
Permit Description: SFR CVPLAN2.5 T22-M0062 V2
Total Completed Inspections - 13
Date Description Inspector Results Comments
05/31/2024 COT - RSPL - Yard Water Line Passed
05/31/2024 COT - RSPL - Sewer Passed
05/31/2024 COT - RSPL - Rough Soil Passed
05/31/2024 COT - RSPL - Backwater Valve Passed
06/06/2024 COT - RSBU - Preslab Passed
06/06/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
06/06/2024 COT - RSEL - Grounding/Bonding Passed
06/06/2024 COT - RSEL - Electrical Underground Passed
08/12/2024 COT - RSBU - Exterior Clips/Sheathing Passed
08/12/2024 COT - RSBU - Roof Nailing Passed
10/04/2024 BULD - Electrical Clearance Passed ECO Clearance issued. Okay to energize panel.
10/28/2024 COT - RSPL - Gas Pressure Test Passed 10-28-24, gas pressure test verified/approved.
10/31/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed

Documents

File Name Document Type  
148068 PT LOT 59 COMPLETE-2024-08-05_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CBT 59 PP FOR PERMIT _V1.PDF DOCUMENTS VIEW
LOT 59 POST TENSION CERTIFICATION-2024-05-01_V1.PDF DOCUMENTS VIEW