Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0324-00328
Permit Details
Apply Date:
05/01/2024
Applicant:
Stephanie Bebee
Description:
SFR CVPLAN2.5 T22-M0062 V2
Permit Reviews
Permit Number - TC-MDP-0324-00328
Permit Status: Issued
Permit Description: SFR CVPLAN2.5 T22-M0062 V2
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/05/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/06/2024 | APPROVED |
07/16/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/17/2024 | APPROVED |
05/02/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 05/08/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0324-00328
Permit Status: Issued
Permit Description: SFR CVPLAN2.5 T22-M0062 V2
Date | Description | Comments |
---|---|---|
05/03/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
05/03/2024 | Post-Tension Inspection Report is required. | |
03/20/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
03/20/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
05/03/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0324-00328
Permit Description: SFR CVPLAN2.5 T22-M0062 V2
Total Completed Inspections - 13
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/31/2024 | COT - RSPL - Yard Water Line | Passed | ||
05/31/2024 | COT - RSPL - Sewer | Passed | ||
05/31/2024 | COT - RSPL - Rough Soil | Passed | ||
05/31/2024 | COT - RSPL - Backwater Valve | Passed | ||
06/06/2024 | COT - RSBU - Preslab | Passed | ||
06/06/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
06/06/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
06/06/2024 | COT - RSEL - Electrical Underground | Passed | ||
08/12/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
08/12/2024 | COT - RSBU - Roof Nailing | Passed | ||
10/04/2024 | BULD - Electrical Clearance | Passed | ECO Clearance issued. Okay to energize panel. | |
10/28/2024 | COT - RSPL - Gas Pressure Test | Passed | 10-28-24, gas pressure test verified/approved. | |
10/31/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed |