Permit: TC-MDP-0324-00325
Permit Details
Apply Date:
05/09/2024
Applicant:
Stephanie Bebee
Description:
SFR PVCS1041 T22-M0050
Permit Reviews
Permit Number - TC-MDP-0324-00325
Permit Status: Issued
Permit Description: SFR PVCS1041 T22-M0050
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/26/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/26/2024 | APPROVED |
09/25/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/25/2024 | APPROVED |
05/09/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 05/15/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0324-00325
Permit Status: Issued
Permit Description: SFR PVCS1041 T22-M0050
Date | Description | Comments |
---|---|---|
05/13/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
03/20/2024 | Post-Tension Inspection Report is required. | |
03/20/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
03/20/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
05/13/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0324-00325
Permit Description: SFR PVCS1041 T22-M0050
Total Completed Inspections - 16
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/10/2024 | COT - RSPL - Sewer | Passed | ||
07/10/2024 | COT - RSPL - Rough Soil | Passed | ||
07/10/2024 | COT - RSPL - Backwater Valve | Passed | ||
07/10/2024 | COT - RSPL - Yard Water Line | Passed | ||
07/15/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
07/15/2024 | COT - RSEL - Electrical Underground | Passed | ||
07/15/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
07/16/2024 | COT - RSBU - Preslab | Passed | ||
08/12/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
08/12/2024 | COT - RSBU - Roof Nailing | Passed | ||
09/17/2024 | RSBU - Building Progress | Passed | ||
10/03/2024 | BULD - Electrical Clearance | Passed | ||
10/03/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
10/03/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
10/18/2024 | COT - RSBU - Firewall/Fire Barrier/Firestop | Passed | ||
10/18/2024 | COT - RSBU - Interior Shear Bracing | Passed |