Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
03/12/2024
Applicant:
Helen Ormsby
Description:
Blackhawk H30G Model Plan

Permit Reviews

Permit Number - TC-MDP-0324-00310
Permit Status: Inspections complete
Permit Description: Blackhawk H30G Model Plan
Start Date Submittal Complete Date Status  
03/15/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 03/25/2024 APPROVED Review Details
09/18/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/19/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0324-00310
Permit Status: Inspections complete
Permit Description: Blackhawk H30G Model Plan
Total Outstanding Activity Conditions - 1
Date Name
03/12/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Conditions

Permit Number - TC-MDP-0324-00310
Permit Status: Inspections complete
Permit Description: Blackhawk H30G Model Plan
Date Description Comments
03/15/2024 Post-Installed Anchor Inspection Report is required.
03/12/2024 Post-Tension Inspection Report is required.
03/15/2024 Post-Tension Inspection Report is required.
03/12/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
03/15/2024 Special Inspection for Soil Testing.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0324-00310
Permit Description: Blackhawk H30G Model Plan
Total Completed Inspections - 21
Date Description Inspector Results Comments
07/11/2024 COT - RSPL - Yard Water Line Passed Okay to backfill. Shading required. 7/11/2024
07/11/2024 COT - RSPL - Rough Soil Passed Okay to backfill. Shading required. 7/11/2024
07/11/2024 COT - RSPL - Sewer Passed Okay to backfill. Shading required. 7/11/2024
07/18/2024 BULD - Electrical Clearance Passed TEP ECO
07/18/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
07/18/2024 COT - RSBU - Preslab Passed
07/18/2024 COT - RSEL - Electrical Underground Passed
07/18/2024 COT - RSEL - Grounding/Bonding Passed
08/15/2024 COT - RSBU - Exterior Clips/Sheathing Passed
08/15/2024 COT - RSBU - Roof Nailing Passed
09/20/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
09/20/2024 COT - RSPL - Gas Pressure Test Passed
10/04/2024 COT - RSBU - Interior Shear Bracing Passed PASS 10/4/2024
11/19/2024 COT - BULD - SWG Clearance Passed 11-19-24, approved for Southwest Gas Co. to install meter.
11/29/2024 COT - RSEL - Electrical Final Passed 11-22-24, plumbing, electrical, mechanical, outdoor lighting, and building final all approved.
11/29/2024 COT - RSEL - Outdoor Lighting Passed 11-22-24, plumbing, electrical, mechanical, outdoor lighting, and building final all approved.
11/29/2024 COT - RSME - Mechanical Final Passed 11-22-24, plumbing, electrical, mechanical, outdoor lighting, and building final all approved.
11/29/2024 COT - RSPL - Plumbing Final Passed 11-22-24, plumbing, electrical, mechanical, outdoor lighting, and building final all approved.
11/22/2024 ENGR Engineering Final Passed CO Ready
11/29/2024 RSBU - Building Final Passed 11-22-24, plumbing, electrical, mechanical, outdoor lighting, and building final all approved.
11/29/2024 RSBU - Building Progress Passed 11-22-24, approved.

Documents

File Name Document Type  
BHK 111 SIC-2024-09-18_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BHK 111 D1_V1.PDF DOCUMENTS VIEW
BHK 111 SIC-2024-03-14_V1.PDF DOCUMENTS VIEW