Permit: TC-MDP-0324-00304
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
9775 E GRAY HAWK DR
Address NEW:
9775 E GRAY HAWK DR
Apply Date:
04/02/2024
Applicant:
Helen Ormsby
Description:
Casas del Cerrito H35G Model Plan
Permit Reviews
Permit Number - TC-MDP-0324-00304
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35G Model Plan
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/04/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 04/10/2024 | APPROVED |
| 09/16/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/17/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0324-00304
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35G Model Plan
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 03/08/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Conditions
Permit Number - TC-MDP-0324-00304
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35G Model Plan
| Date | Description | Comments |
|---|---|---|
| 04/16/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 04/05/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 04/05/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 03/08/2024 | Post-Tension Inspection Report is required. | |
| 03/08/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 04/05/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 04/05/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0324-00304
Permit Description: Casas del Cerrito H35G Model Plan
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/04/2024 | COT - RSPL - Backwater Valve | Passed | ||
| 06/04/2024 | COT - RSPL - Rough Soil | Passed | ||
| 06/04/2024 | COT - RSPL - Sewer | Passed | ||
| 06/04/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 06/12/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, post tension cabling is installed and evenly spaced, rebar reinforcement is in place per plans, underground plumbing is properly wrapped with foam, underground electrical conduit is in place for kitchen island, and Ufer ground rods are installed in bottom of footing. Okay to pour concrete. | |
| 06/12/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, post tension cabling is installed and evenly spaced, rebar reinforcement is in place per plans, underground plumbing is properly wrapped with foam, underground electrical conduit is in place for kitchen island, and Ufer ground rods are installed in bottom of footing. Okay to pour concrete. | |
| 06/12/2024 | COT - RSEL - Electrical Underground | Passed | Concrete forms are set, post tension cabling is installed and evenly spaced, rebar reinforcement is in place per plans, underground plumbing is properly wrapped with foam, underground electrical conduit is in place for kitchen island, and Ufer ground rods are installed in bottom of footing. Okay to pour concrete. | |
| 06/12/2024 | COT - RSEL - Grounding/Bonding | Passed | Concrete forms are set, post tension cabling is installed and evenly spaced, rebar reinforcement is in place per plans, underground plumbing is properly wrapped with foam, underground electrical conduit is in place for kitchen island, and Ufer ground rods are installed in bottom of footing. Okay to pour concrete. | |
| 06/25/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 06/26/2024 | COT - RSBU - Roof Nailing | Passed | 6/26/24: Roof trusses are properly secured to top plate with nails and H2.5 clips. Plywood sheathing is nailed to roof trusses per plan and code requirements. Okay to proceed with top out of plumbing and rough-in of mechanical and electrical. | |
| 07/12/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
| 07/15/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 07/26/2024 | BULD - Electrical Clearance | Passed | TEP ECO Clearance issued for 9775 E Gray Hawk Dr. | |
| 07/26/2024 | COT - RSBU - Interior Shear Bracing | Passed | 7/26/24: Drywall for shear walls is properly secured to the studs per the plan. Okay to proceed with drywall tape, texture, and paint. | |
| 09/13/2024 | COT - BULD - SWG Clearance | Passed | SWG Clearance issued to Southwest Gas Company. | |
| 09/23/2024 | COT - RSEL - Electrical Final | Passed | Passed final EGO CLEARANCE 9/23/24 | |
| 09/23/2024 | COT - RSEL - Outdoor Lighting | Passed | Passed final 9/23/24 | |
| 09/23/2024 | COT - RSME - Mechanical Final | Passed | Passed final 9/23/24 | |
| 09/23/2024 | COT - RSPL - Plumbing Final | Passed | Passed final 9/23/24 | |
| 09/23/2024 | RSBU - Building Final | Passed | Passed final 9/23/24 | |
| 09/23/2024 | RSBU - Building Progress | Passed | Passed final 9/23/24 | |
| 09/24/2024 | ENGR Engineering Final | Passed |