Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
9775 E GRAY HAWK DR
Apply Date:
04/02/2024
Applicant:
Helen Ormsby
Description:
Casas del Cerrito H35G Model Plan

Permit Reviews

Permit Number - TC-MDP-0324-00304
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35G Model Plan
Start Date Submittal Complete Date Status  
04/04/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 04/10/2024 APPROVED Review Details
09/16/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/17/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0324-00304
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35G Model Plan
Total Outstanding Activity Conditions - 1
Date Name
03/08/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Conditions

Permit Number - TC-MDP-0324-00304
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35G Model Plan
Date Description Comments
04/16/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
04/05/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/05/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
03/08/2024 Post-Tension Inspection Report is required.
03/08/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
04/05/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
04/05/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0324-00304
Permit Description: Casas del Cerrito H35G Model Plan
Total Completed Inspections - 22
Date Description Inspector Results Comments
06/04/2024 COT - RSPL - Backwater Valve Passed
06/04/2024 COT - RSPL - Rough Soil Passed
06/04/2024 COT - RSPL - Sewer Passed
06/04/2024 COT - RSPL - Yard Water Line Passed
06/12/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Concrete forms are set, post tension cabling is installed and evenly spaced, rebar reinforcement is in place per plans, underground plumbing is properly wrapped with foam, underground electrical conduit is in place for kitchen island, and Ufer ground rods are installed in bottom of footing. Okay to pour concrete.
06/12/2024 COT - RSBU - Preslab Passed Concrete forms are set, post tension cabling is installed and evenly spaced, rebar reinforcement is in place per plans, underground plumbing is properly wrapped with foam, underground electrical conduit is in place for kitchen island, and Ufer ground rods are installed in bottom of footing. Okay to pour concrete.
06/12/2024 COT - RSEL - Electrical Underground Passed Concrete forms are set, post tension cabling is installed and evenly spaced, rebar reinforcement is in place per plans, underground plumbing is properly wrapped with foam, underground electrical conduit is in place for kitchen island, and Ufer ground rods are installed in bottom of footing. Okay to pour concrete.
06/12/2024 COT - RSEL - Grounding/Bonding Passed Concrete forms are set, post tension cabling is installed and evenly spaced, rebar reinforcement is in place per plans, underground plumbing is properly wrapped with foam, underground electrical conduit is in place for kitchen island, and Ufer ground rods are installed in bottom of footing. Okay to pour concrete.
06/25/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
06/26/2024 COT - RSBU - Roof Nailing Passed 6/26/24: Roof trusses are properly secured to top plate with nails and H2.5 clips. Plywood sheathing is nailed to roof trusses per plan and code requirements. Okay to proceed with top out of plumbing and rough-in of mechanical and electrical.
07/12/2024 COT - RSPL - Gas Pressure Test Passed
07/15/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
07/26/2024 BULD - Electrical Clearance Passed TEP ECO Clearance issued for 9775 E Gray Hawk Dr.
07/26/2024 COT - RSBU - Interior Shear Bracing Passed 7/26/24: Drywall for shear walls is properly secured to the studs per the plan. Okay to proceed with drywall tape, texture, and paint.
09/13/2024 COT - BULD - SWG Clearance Passed SWG Clearance issued to Southwest Gas Company.
09/23/2024 COT - RSEL - Electrical Final Passed Passed final EGO CLEARANCE 9/23/24
09/23/2024 COT - RSEL - Outdoor Lighting Passed Passed final 9/23/24
09/23/2024 COT - RSME - Mechanical Final Passed Passed final 9/23/24
09/23/2024 COT - RSPL - Plumbing Final Passed Passed final 9/23/24
09/23/2024 RSBU - Building Final Passed Passed final 9/23/24
09/23/2024 RSBU - Building Progress Passed Passed final 9/23/24
09/24/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
CDC 10 SIC-2024-09-13_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CDC 10 SIC-2024-04-02_V1.PDF DOCUMENTS VIEW
CONS-CDC 10 D1_V1.PDF DOCUMENTS VIEW