Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
6102 E FALCONRY TR
Apply Date:
03/08/2024
Applicant:
Alonzo Martinez
Description:
Blackhawk H30D Model Plan

Permit Reviews

Permit Number - TC-MDP-0324-00302
Permit Status: Inspections complete
Permit Description: Blackhawk H30D Model Plan
Start Date Submittal Complete Date Status  
03/15/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.1 03/25/2024 APPROVED Review Details
05/23/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/27/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0324-00302
Permit Status: Inspections complete
Permit Description: Blackhawk H30D Model Plan
Total Outstanding Activity Conditions - 1
Date Name
03/08/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Conditions

Permit Number - TC-MDP-0324-00302
Permit Status: Inspections complete
Permit Description: Blackhawk H30D Model Plan
Date Description Comments
03/15/2024 Post-Installed Anchor Inspection Report is required.
03/08/2024 Post-Tension Inspection Report is required.
03/15/2024 Post-Tension Inspection Report is required.
03/08/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
03/15/2024 Special inspection for Soil Testing.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0324-00302
Permite Description: Blackhawk H30D Model Plan
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
04/22/2025 RSBU - Building Progress N/A Canceled
06/23/2025 COT - RSPL - Plumbing Final N/A Re-inspection required Breaker not labeled at panel. Provide traffic rated cap for sewer. Add post tension tag at hose bib. Missing receptacle in garage. Insulate hot water line in garage. Provide ladder for attic access. Clean label at garage door. Missing receptacle in East wall. 6/23/2025
06/23/2025 COT - RSEL - Electrical Final N/A Re-inspection required Breaker not labeled at panel. Provide traffic rated cap for sewer. Add post tension tag at hose bib. Missing receptacle in garage. Insulate hot water line in garage. Provide ladder for attic access. Clean label at garage door. Missing receptacle in East wall. 6/23/2025
06/23/2025 COT - RSME - Mechanical Final N/A Re-inspection required Breaker not labeled at panel. Provide traffic rated cap for sewer. Add post tension tag at hose bib. Missing receptacle in garage. Insulate hot water line in garage. Provide ladder for attic access. Clean label at garage door. Missing receptacle in East wall. 6/23/2025
06/23/2025 RSBU - Building Final N/A Re-inspection required Breaker not labeled at panel. Provide traffic rated cap for sewer. Add post tension tag at hose bib. Missing receptacle in garage. Insulate hot water line in garage. Provide ladder for attic access. Clean label at garage door. Missing receptacle in East wall. 6/23/2025

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0324-00302
Permit Description: Blackhawk H30D Model Plan
Total Completed Inspections - 22
Date Description Inspector Results Comments
03/13/2025 COT - RSPL - Yard Water Line Passed
03/13/2025 COT - RSPL - Backwater Valve Passed
03/13/2025 COT - RSPL - Rough Soil Passed
03/13/2025 COT - RSPL - Sewer Passed
03/21/2025 COT - RSBU - Preslab Passed Passed 3/21/25 ok to pour concrete
03/21/2025 COT - RSEL - Grounding/Bonding Passed Passed 3/21/25 ok to pour concrete
03/21/2025 COT - RSEL - Electrical Underground Passed Passed 3/21/25 ok to pour concrete
03/21/2025 BULD - Electrical Clearance Passed Passed 3/21/25 ready for temp power CLEARANCE ECO
03/21/2025 COT - RSBU - Excavation/Rebar/Zoning Passed Passed 3/21/25 ok to pour concrete
03/27/2025 COT - RSBU - Interior Shear Bracing Passed
04/02/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 2 April 25
Pass
04/11/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
04/11/2025 COT - RSPL - Gas Pressure Test Passed
04/23/2025 COT - RSBU - Roof Nailing Passed 4-23-25, previously inspected & approved by O. Soares.
04/22/2025 RSBU - Building Progress Passed 4-22-25, interior shear bracing approved. Okay to tape & texture drywall.
05/28/2025 COT - BULD - SWG Clearance Passed 5-28-25, okay for SWG to install meter. Clearance issued.
06/23/2025 COT - RSEL - Outdoor Lighting Passed
06/23/2025 ENGR Engineering Final Passed Site is clean and safe, everything is in accordance with approved plans.
06/25/2025 COT - RSPL - Plumbing Final Passed
06/27/2025 COT - RSEL - Electrical Final Passed
06/27/2025 COT - RSME - Mechanical Final Passed
06/27/2025 RSBU - Building Final Passed

Documents

File Name Document Type  
BHK 107 SIC-2025-05-21_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BHK 107 D1_V1.PDF DOCUMENTS VIEW
BHK 107 SIC-2024-03-14_V1.PDF DOCUMENTS VIEW