Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0324-00292
Permit Details
Apply Date:
03/07/2024
Applicant:
Varnado Standifer
Description:
Blackhawk T934 - Frasier
Permit Reviews
Permit Number - TC-MDP-0324-00292
Permit Status: Inspections complete
Permit Description: Blackhawk T934 - Frasier
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/11/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 03/21/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0324-00292
Permit Status: Inspections complete
Permit Description: Blackhawk T934 - Frasier
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
03/07/2024 | Post-Tension Inspection Report is required. |
03/07/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
03/21/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
03/21/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
03/21/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0324-00292
Permit Status: Inspections complete
Permit Description: Blackhawk T934 - Frasier
Date | Description | Comments |
---|---|---|
03/21/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
03/07/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
03/21/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0324-00292
Permit Description: Blackhawk T934 - Frasier
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/09/2024 | COT - RSPL - Rough Soil | Passed | ||
05/09/2024 | COT - RSPL - Sewer | Passed | ||
05/09/2024 | COT - RSPL - Yard Water Line | Passed | ||
05/28/2024 | COT - RSBU - Preslab | Passed | ||
05/28/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
05/28/2024 | COT - RSEL - Electrical Underground | Passed | ||
06/10/2024 | COT - RSBU - Roof Nailing | Passed | ||
06/13/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
07/10/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
07/10/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
07/10/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
07/24/2024 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 7/24/2024 | |
07/24/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
08/20/2024 | RSBU - Building Progress | Passed | front entry footings and mat per plan. okay for concrete placement. 8/20/2024 | |
09/19/2024 | COT - BULD - SWG Clearance | Passed | Approved from Southwest gas to install meter. | |
09/18/2024 | COT - RSEL - Electrical Final | Passed | Final approved pending engineering. | |
09/18/2024 | COT - RSEL - Outdoor Lighting | Passed | Outdoor lighting approved. | |
09/18/2024 | COT - RSME - Mechanical Final | Passed | Mechanical approved. | |
09/18/2024 | COT - RSPL - Plumbing Final | Passed | ||
10/01/2024 | ENGR Engineering Final | Passed | CO Ready | |
10/18/2024 | RSBU - Building Final | Passed | 10-18-24, final inspection approved. |