Permit: TC-MDP-0324-00287
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
4795 E JULIAN WASH DR
Address NEW:
4795 E JULIAN WASH DR
Apply Date:
03/29/2024
Applicant:
Description:
SFR MERI156021 T21-M0063
Permit Reviews
Permit Number - TC-MDP-0324-00287
Permit Status: Complete
Permit Description: SFR MERI156021 T21-M0063
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/01/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 04/05/2024 | APPROVED |
| 12/19/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/19/2024 | APPROVED |
| 10/09/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/09/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0324-00287
Permit Status: Complete
Permit Description: SFR MERI156021 T21-M0063
| Date | Description | Comments |
|---|---|---|
| 04/03/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 04/03/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 04/03/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 04/03/2024 | Post-Tension Inspection Report is required. | |
| 03/05/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 03/05/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 04/03/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 04/03/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0324-00287
Permit Description: SFR MERI156021 T21-M0063
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/24/2024 | COT - RSPL - Rough Soil | Passed | 10-24-24, underground plumbing per approved plans. Okay to backfill. | |
| 10/24/2024 | COT - RSPL - Sewer | Passed | 10-24-24, sewer connection approved. Okay to backfill. | |
| 10/24/2024 | COT - RSPL - Yard Water Line | Passed | 10-24-24, main water line inspection approved. Okay to backfill. | |
| 11/01/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 11-1-24, setbacks verified per approved plans. | |
| 11/01/2024 | COT - RSEL - Electrical Underground | Passed | 11-1-24, approved-conduit in place. | |
| 11/01/2024 | COT - RSBU - Preslab | Passed | 11-1-24, preslab per approved plans. Okay to pour concrete. | |
| 11/01/2024 | COT - RSEL - Grounding/Bonding | Passed | 11-1-24, grounding/bonding inspection per approved plans. Okay to pour concrete. | |
| 11/15/2024 | COT - RSBU - Roof Nailing | Passed | 11-15-24, roof nailing and truss bracing verified as per approved plans. | |
| 11/15/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 11-15-24, exterior clips/sheathing ,roof nailing and truss bracing verified as per approved plans. | |
| 12/10/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Passed 12/10/24 | |
| 12/10/2024 | BULD - Electrical Clearance | Passed | Ready for temp power 12/10/24 CLEARANCE ECO | |
| 12/10/2024 | COT - RSPL - Gas Pressure Test | Passed | Holds pressure 12/10/24 passed | |
| 12/19/2024 | COT - RSBU - Interior Shear Bracing | Passed | 12/19/24 ok to proceed. | |
| 02/04/2025 | COT - BULD - SWG Clearance | Passed | 2/4/25 approval for SWG clearance. | |
| 02/13/2025 | COT - RSEL - Electrical Final | Passed | Passed final 2/13/25 CLEARANCE ECO | |
| 02/13/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed final 2/13/25 | |
| 02/13/2025 | COT - RSME - Mechanical Final | Passed | Passed final 2/13/25 | |
| 02/13/2025 | COT - RSPL - Plumbing Final | Passed | Passed final 2/13/25 | |
| 02/13/2025 | ENGR Engineering Final | Passed | CO Ready | |
| 02/13/2025 | RSBU - Building Final | Passed | Passed final 2/13/25 | |
| 02/13/2025 | RSBU - Building Progress | Passed | Passed final 2/13/25 |