Permit: TC-MDP-0324-00282
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
4767 E JULIAN WASH DR
Address NEW:
4767 E JULIAN WASH DR
Apply Date:
03/05/2024
Applicant:
Description:
SFR MERI156021 T21-M0063
Permit Reviews
Permit Number - TC-MDP-0324-00282
Permit Status: Complete
Permit Description: SFR MERI156021 T21-M0063
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/31/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/31/2025 | APPROVED |
| 05/02/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 05/09/2024 | APPROVED |
| 01/16/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/17/2025 | APPROVED |
| 10/09/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/09/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0324-00282
Permit Status: Complete
Permit Description: SFR MERI156021 T21-M0063
| Date | Description | Comments |
|---|---|---|
| 05/02/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 05/02/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 05/02/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 05/02/2024 | Post-Tension Inspection Report is required. | |
| 03/05/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 03/05/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 05/02/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 05/02/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0324-00282
Permit Description: SFR MERI156021 T21-M0063
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/25/2024 | COT - RSPL - Yard Water Line | Passed | 11-25-24, main water line, underground plumbing and sewer connection approved. Okay to backfill. | |
| 11/25/2024 | COT - RSPL - Sewer | Passed | 11-25-24, main water line, underground plumbing and sewer connection approved. Okay to backfill. | |
| 11/25/2024 | COT - RSPL - Rough Soil | Passed | 11-25-24, main water line, underground plumbing and sewer connection approved. Okay to backfill. | |
| 12/04/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 12-4-24, excavation/rebar/setbacks verified as per approved plans. Okay to pour concrete. | |
| 12/04/2024 | COT - RSBU - Preslab | Passed | 12-4-24, preslab,excavation/rebar/and setbacks approved. Okay to pour concrete. | |
| 12/04/2024 | COT - RSEL - Electrical Underground | Passed | 12-4-24, preslab, underground electric,excavation/rebar/and setbacks approved. Okay to pour concrete. | |
| 12/04/2024 | COT - RSEL - Grounding/Bonding | Passed | 12-4-24, grounding/bonding verified. | |
| 12/11/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Passed final on all inspections 12/11/24 | |
| 12/11/2024 | COT - RSBU - Roof Nailing | Passed | Per plans, no loose panels 12/11/24 | |
| 01/17/2025 | BULD - Electrical Clearance | Passed | Ready for temp power CLEARANCE ECO 1/17/25 | |
| 01/17/2025 | COT - RSPL - Gas Pressure Test | Passed | Held pressure 1/17/25 | |
| 01/21/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 1-21-25, intermediates approved. Okay to continue with construction. | |
| 01/31/2025 | COT - RSBU - Interior Shear Bracing | Passed | 1/31/25 pass | |
| 03/19/2025 | COT - BULD - SWG Clearance | Passed | 18 March 25 SOUTHWEST GAS CLEARANCE: SWG |
|
| 03/27/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 03/27/2025 | COT - RSME - Mechanical Final | Passed | ||
| 03/27/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 03/27/2025 | ENGR Engineering Final | Passed | CO Ready Caps missing on block wall |
|
| 03/27/2025 | RSBU - Building Progress | Passed | ||
| 03/28/2025 | COT - RSEL - Electrical Final | Passed | ||
| 03/28/2025 | RSBU - Building Final | Passed |