Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0324-00279
Permit Details
Apply Date:
03/07/2024
Applicant:
Daria Hopkins
Description:
SFR MER1301600 T21-M0073 REV1 roof covering change
Permit Reviews
Permit Number - TC-MDP-0324-00279
Permit Status: Complete
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/08/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 03/21/2024 | APPROVED |
07/22/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/24/2024 | REQUIRES RESUBMIT |
07/26/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 07/26/2024 | APPROVED |
10/25/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/28/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0324-00279
Permit Status: Complete
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Date | Description | Comments |
---|---|---|
03/21/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
03/21/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
03/21/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
03/21/2024 | Post-Tension Inspection Report is required. | |
03/05/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
03/05/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
07/24/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
03/21/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0324-00279
Permite Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/14/2024 | COT - RSEL - Electrical Final | N/A | Re-inspection required | 10-14-24,Receptacle on northside of island has reversed polarity. Reinspection required. |
10/14/2024 | RSBU - Building Final | N/A | Re-inspection required | 10-14-24, Reinspection required for reversed polarity on island receptacle (northside). |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0324-00279
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Total Completed Inspections - 22
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/29/2024 | COT - RSPL - Rough Soil | Passed | Underground plumbing, sewer line, and backwater valve are properly installed and under a water test. Okay to shade pipes and backfill trenches. | |
05/29/2024 | COT - RSPL - Backwater Valve | Passed | Underground plumbing, sewer line, and backwater valve are properly installed and under a water test. Okay to shade pipes and backfill trenches. | |
05/29/2024 | COT - RSPL - Sewer | Passed | Underground plumbing, sewer line, and backwater valve are properly installed and under a water test. Okay to shade pipes and backfill trenches. | |
05/29/2024 | COT - RSPL - Yard Water Line | Passed | Main water supply line is connected to water meter, with blue tracer wire from meter to house, and under street pressure with no leaks. Okay to shade pipe and backfill trench. | |
06/12/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, post tension cabling is properly installed and evenly spaced, rebar reinforcement is in place per plans, masa clips and shear wall hold downs are properly secured to form, subsoil is compacted, underground plumbing is properly wrapped with foam, underground electrical is installed for kitchen island, and Ufer ground is installed in footing on garage side of house. | |
06/12/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, post tension cabling is properly installed and evenly spaced, rebar reinforcement is in place per plans, masa clips and shear wall hold downs are properly secured to form, subsoil is compacted, underground plumbing is properly wrapped with foam, underground electrical is installed for kitchen island, and Ufer ground is installed in footing on garage side of house. | |
06/12/2024 | COT - RSEL - Electrical Underground | Passed | Concrete forms are set, post tension cabling is properly installed and evenly spaced, rebar reinforcement is in place per plans, masa clips and shear wall hold downs are properly secured to form, subsoil is compacted, underground plumbing is properly wrapped with foam, underground electrical is installed for kitchen island, and Ufer ground is installed in footing on garage side of house. | |
06/12/2024 | COT - RSEL - Grounding/Bonding | Passed | Concrete forms are set, post tension cabling is properly installed and evenly spaced, rebar reinforcement is in place per plans, masa clips and shear wall hold downs are properly secured to form, subsoil is compacted, underground plumbing is properly wrapped with foam, underground electrical is installed for kitchen island, and Ufer ground is installed in footing on garage side of house. | |
06/27/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
06/27/2024 | COT - RSBU - Roof Nailing | Passed | ||
07/26/2024 | BULD - Electrical Clearance | Passed | ||
07/26/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
07/26/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
08/13/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
08/15/2024 | RSBU - Building Progress | Passed | ||
09/20/2024 | COT - BULD - SWG Clearance | Passed | SWG FOR METER ONLY | |
10/14/2024 | COT - RSEL - Outdoor Lighting | Passed | 10-14-24, plumbing final approved. | |
10/14/2024 | COT - RSME - Mechanical Final | Passed | 10-14-24, mechanical final approved. | |
10/14/2024 | COT - RSPL - Plumbing Final | Passed | 10-14-24, plumbing final approved. | |
10/14/2024 | ENGR Engineering Final | Passed | ||
10/15/2024 | COT - RSEL - Electrical Final | Passed | 10/15/24 pass | |
10/15/2024 | RSBU - Building Final | Passed | 10/15/24 pass |