Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0324-00278
Permit Details
Apply Date:
04/24/2024
Applicant:
Daria Hopkins
Description:
SFR MER1301600 T21-M0073 REV1 roof covering change
Permit Reviews
Permit Number - TC-MDP-0324-00278
Permit Status: Issued
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/26/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 05/01/2024 | APPROVED |
10/03/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/03/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0324-00278
Permit Status: Issued
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Date | Description | Comments |
---|---|---|
04/29/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
04/29/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
04/29/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
04/29/2024 | Post-Tension Inspection Report is required. | |
03/05/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
03/05/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
04/29/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-MDP-0324-00278
Permite Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/17/2024 | COT - RSBU - Interior Shear Bracing | N/A | Re-inspection required | 10-17-24, drywall in garage shear wall damaged due to over penetration of more than 1/8 of an inch.Fasteners shall not be less than 3/8 of an inch from edge of drywall. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0324-00278
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Total Completed Inspections - 15
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/13/2024 | COT - RSPL - Backwater Valve | Passed | ||
08/13/2024 | COT - RSPL - Rough Soil | Passed | ||
08/13/2024 | COT - RSPL - Sewer | Passed | ||
08/13/2024 | COT - RSPL - Yard Water Line | Passed | ||
08/15/2024 | RSBU - Building Progress | Passed | ||
08/20/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
08/20/2024 | COT - RSBU - Preslab | Passed | ||
08/20/2024 | COT - RSEL - Electrical Underground | Passed | ||
08/20/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
09/06/2024 | COT - RSBU - Roof Nailing | Passed | Roof sheathing is properly secured to trusses, trusses are secured to top plate with H2.5 clips. Okay to proceed with rough-in of mechanical, electrical, and plumbing. | |
09/06/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | Exterior walls and interior walls are properly secured to concrete floor with masa clips, j-bolts, titan bolts, cut nails, or shot pins. Plywood sheathing is properly secured to studs per plan for shear walls. All masa clips and shear wall hold downs are nailed properly. Okay to proceed with rough-in. | |
09/26/2024 | BULD - Electrical Clearance | Passed | PASSED ELECTRICAL CLEARANCE ECO 9/26/24 | |
09/30/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with installation of insulation and drywall. | |
09/30/2024 | COT - RSPL - Gas Pressure Test | Passed | Gas lines are properly installed and under 15 psi air pressure test with no leaks. Okay to proceed. | |
10/18/2024 | COT - RSBU - Interior Shear Bracing | Passed | 10/18/24: Drywall has replaced that was noted as damaged. Okay to proceed with tape, texture, and paint. |