Permit: TC-MDP-0324-00277
Permit Details
Apply Date:
03/29/2024
Applicant:
Daria Hopkins
Description:
SFR MER1301600 T21-M0073 REV1 roof covering change
Permit Reviews
Permit Number - TC-MDP-0324-00277
Permit Status: Issued
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/01/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 04/08/2024 | APPROVED |
09/16/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 09/17/2024 | APPROVED |
09/12/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/12/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-MDP-0324-00277
Permit Status: Issued
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Date | Description | Comments |
---|---|---|
04/03/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
04/03/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
04/03/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
04/03/2024 | Post-Tension Inspection Report is required. | |
03/05/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
09/17/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
03/05/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
04/03/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. | |
09/17/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-MDP-0324-00277
Permite Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Total Outstanding Inspections - 6
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/18/2024 | COT - RSEL - Outdoor Lighting | N/A | Canceled | 11-18-24, cancelled by contractor. |
11/18/2024 | COT - RSEL - Electrical Final | N/A | Canceled | 11-18-24, cancelled by contractor. |
11/18/2024 | COT - RSME - Mechanical Final | N/A | Canceled | 11-18-24, cancelled by contractor. |
11/18/2024 | COT - RSPL - Plumbing Final | N/A | Canceled | 11-18-24, cancelled by contractor. |
11/18/2024 | ENGR Engineering Final | N/A | Partial Pass | Contractor needs to finish the landscaping |
11/18/2024 | RSBU - Building Final | N/A | Canceled | 11-18-24, cancelled by contractor. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0324-00277
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Total Completed Inspections - 15
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/09/2024 | COT - RSPL - Rough Soil | Passed | ||
07/09/2024 | COT - RSPL - Sewer | Passed | ||
07/09/2024 | COT - RSPL - Yard Water Line | Passed | ||
07/16/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
07/16/2024 | COT - RSBU - Preslab | Passed | ||
07/16/2024 | COT - RSEL - Electrical Underground | Passed | ||
07/16/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
08/12/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | Exterior and interior walls are properly secured to concrete floor with cut nails, j-bolts, shot pins, masa clips, or titan bolts. Shear walls are properly bolted down to concrete floor and plywood sheathing is properly secured to studs per plan requirements. Okay to proceed with rough-in of mechanical, electrical, and plumbing work. | |
08/12/2024 | COT - RSBU - Roof Nailing | Passed | Roof trusses are properly installed and secured to the exterior wall top plate with nails and H2.5 clips. Plywood sheathing is properly installed and secured to roof trusses. Okay to proceed with rough-in of mechanical, electrical, and plumbing work. | |
09/11/2024 | BULD - Electrical Clearance | Passed | ||
09/11/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
09/13/2024 | RSBU - Building Progress | Passed | ||
09/13/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
09/20/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
11/08/2024 | COT - BULD - SWG Clearance | Passed | SWG CLEARANCE ISSUED. |