Permit Reviews

Permit Number - TC-MDP-0324-00276
Permit Status: Issued
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Start Date Submittal Complete Date Status  
04/01/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 04/08/2024 APPROVED Review Details
09/12/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/16/2024 APPROVED Review Details
12/18/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/18/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0324-00276
Permit Status: Issued
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Date Description Comments
04/03/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
04/03/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/03/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/03/2024 Post-Tension Inspection Report is required.
03/05/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
03/05/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
04/03/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0324-00276
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Total Completed Inspections - 22
Date Description Inspector Results Comments
07/16/2024 COT - RSPL - Sewer Passed
07/16/2024 COT - RSPL - Yard Water Line Passed
07/17/2024 COT - RSPL - Backwater Valve Passed
07/17/2024 COT - RSPL - Rough Soil Passed
07/22/2024 COT - RSBU - Excavation/Rebar/Zoning Passed 7/22/24: Concrete forms are set, post tension cabling is evenly spaced, all required rebar reinforcement is installed, Ufer ground is installed in footing on garage wall, masa clips are attached to the form, underground electrical conduit is installed for kitchen island and all plumbing pipes are properly wrapped with foam wrap. Okay to pour concrete.
07/22/2024 COT - RSBU - Preslab Passed 7/22/24: Concrete forms are set, post tension cabling is evenly spaced, all required rebar reinforcement is installed, Ufer ground is installed in footing on garage wall, masa clips are attached to the form, underground electrical conduit is installed for kitchen island and all plumbing pipes are properly wrapped with foam wrap. Okay to pour concrete.
07/22/2024 COT - RSEL - Electrical Underground Passed 7/22/24: Concrete forms are set, post tension cabling is evenly spaced, all required rebar reinforcement is installed, Ufer ground is installed in footing on garage wall, masa clips are attached to the form, underground electrical conduit is installed for kitchen island and all plumbing pipes are properly wrapped with foam wrap. Okay to pour concrete.
07/22/2024 COT - RSEL - Grounding/Bonding Passed 7/22/24: Concrete forms are set, post tension cabling is evenly spaced, all required rebar reinforcement is installed, Ufer ground is installed in footing on garage wall, masa clips are attached to the form, underground electrical conduit is installed for kitchen island and all plumbing pipes are properly wrapped with foam wrap. Okay to pour concrete.
08/20/2024 COT - RSBU - Exterior Clips/Sheathing Passed
08/20/2024 COT - RSBU - Roof Nailing Passed
09/18/2024 BULD - Electrical Clearance Passed
09/18/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
09/18/2024 COT - RSPL - Gas Pressure Test Passed
09/19/2024 RSBU - Building Progress Passed
10/02/2024 COT - RSBU - Interior Shear Bracing Passed 10-2-24, Okay to tape and texture.
11/08/2024 COT - BULD - SWG Clearance Passed SWG CLEARANCE ISSUED.
12/02/2024 ENGR Engineering Final Passed Tree stakes
Weep blocks in rear wall
Wing wall gate
12/02/2024 RSBU - Building Final Passed Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully operational. Outdoor lighting is to plan and city requirements. Okay to issue Certificate of Occupancy for this permit.
12/02/2024 COT - RSPL - Plumbing Final Passed Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully operational. Outdoor lighting is to plan and city requirements. Okay to issue Certificate of Occupancy for this permit.
12/02/2024 COT - RSEL - Electrical Final Passed Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully operational. Outdoor lighting is to plan and city requirements. Okay to issue Certificate of Occupancy for this permit.
12/02/2024 COT - RSME - Mechanical Final Passed Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully operational. Outdoor lighting is to plan and city requirements. Okay to issue Certificate of Occupancy for this permit.
12/02/2024 COT - RSEL - Outdoor Lighting Passed Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully operational. Outdoor lighting is to plan and city requirements. Okay to issue Certificate of Occupancy for this permit.

Documents

File Name Document Type  
149054 PT LOT 191 COMPLETE-2024-09-09_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 191 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 191 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 191 SPECIAL INSPECTION CERTIFICATE-2024-03-29_V1.PDF DOCUMENTS VIEW