Permit: TC-MDP-0324-00276
Permit Details
Apply Date:
03/29/2024
Applicant:
Daria Hopkins
Description:
SFR MER1301600 T21-M0073 REV1 roof covering change
Permit Reviews
Permit Number - TC-MDP-0324-00276
Permit Status: Issued
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/01/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 04/08/2024 | APPROVED |
09/12/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/16/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0324-00276
Permit Status: Issued
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
03/05/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Conditions
Permit Number - TC-MDP-0324-00276
Permit Status: Issued
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Date | Description | Comments |
---|---|---|
04/03/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
04/03/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
04/03/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
04/03/2024 | Post-Tension Inspection Report is required. | |
03/05/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
04/03/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0324-00276
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Total Completed Inspections - 16
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/16/2024 | COT - RSPL - Sewer | Passed | ||
07/16/2024 | COT - RSPL - Yard Water Line | Passed | ||
07/17/2024 | COT - RSPL - Backwater Valve | Passed | ||
07/17/2024 | COT - RSPL - Rough Soil | Passed | ||
07/22/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 7/22/24: Concrete forms are set, post tension cabling is evenly spaced, all required rebar reinforcement is installed, Ufer ground is installed in footing on garage wall, masa clips are attached to the form, underground electrical conduit is installed for kitchen island and all plumbing pipes are properly wrapped with foam wrap. Okay to pour concrete. | |
07/22/2024 | COT - RSBU - Preslab | Passed | 7/22/24: Concrete forms are set, post tension cabling is evenly spaced, all required rebar reinforcement is installed, Ufer ground is installed in footing on garage wall, masa clips are attached to the form, underground electrical conduit is installed for kitchen island and all plumbing pipes are properly wrapped with foam wrap. Okay to pour concrete. | |
07/22/2024 | COT - RSEL - Electrical Underground | Passed | 7/22/24: Concrete forms are set, post tension cabling is evenly spaced, all required rebar reinforcement is installed, Ufer ground is installed in footing on garage wall, masa clips are attached to the form, underground electrical conduit is installed for kitchen island and all plumbing pipes are properly wrapped with foam wrap. Okay to pour concrete. | |
07/22/2024 | COT - RSEL - Grounding/Bonding | Passed | 7/22/24: Concrete forms are set, post tension cabling is evenly spaced, all required rebar reinforcement is installed, Ufer ground is installed in footing on garage wall, masa clips are attached to the form, underground electrical conduit is installed for kitchen island and all plumbing pipes are properly wrapped with foam wrap. Okay to pour concrete. | |
08/20/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
08/20/2024 | COT - RSBU - Roof Nailing | Passed | ||
09/18/2024 | BULD - Electrical Clearance | Passed | ||
09/18/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
09/18/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
09/19/2024 | RSBU - Building Progress | Passed | ||
10/02/2024 | COT - RSBU - Interior Shear Bracing | Passed | 10-2-24, Okay to tape and texture. | |
11/08/2024 | COT - BULD - SWG Clearance | Passed | SWG CLEARANCE ISSUED. |